Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Railway applications - Energy measurement on board trains - Part 1: General
40.20 DIS ballot initiated: 12 weeks
Railway applications - Energy measurement on board trains - Part 2: Energy measurement
40.20 DIS ballot initiated: 12 weeks
Railway applications - Energy measurement on board trains - Part 3: Data handling
40.20 DIS ballot initiated: 12 weeks
Railway applications - Energy measurement on board trains - Part 4: Communication
40.20 DIS ballot initiated: 12 weeks
Railway applications - Energy measurement on board trains - Part 5: Conformance test
40.20 DIS ballot initiated: 12 weeks
Railway applications - Energy measurement on board trains - Part 6: Requirements for purposes other than billing
40.20 DIS ballot initiated: 12 weeks
Charging cables for electric vehicles of rated voltages up to and including 0,6/1 kV - Part 4-2: Cables for DC charging according to mode 4 of IEC 61851-1 - Cables intended to be used with a thermal management system
20.99 WD approved for registration as CD
Photovoltaic inverters - Data sheet and name plate
20.99 WD approved for registration as CD
Microgrids - Technical requirements - Testing for Microgrid Monitoring, Control, and Energy Management Systems
50.00 Final text received or FDIS registered for formal approval
Microgrids – Technical Requirements – Emergency supply of microgrids by electric vehicles
20.99 WD approved for registration as CD
Microgrids - Part 4: Use cases
40.99 Full report circulated: DIS approved for registration as FDIS
Guidelines for the operation and control of microgrid clusters
30.20 CD study/ballot initiated
Printed electronics - Part 202-12: Materials - Rheological property measurement methods of inkjet ink for printed electronics
30.60 Close of voting/ comment period
Printed electronics - Part 202-13: Materials - Sheet resistance measurement method for conductive layer in printed and in-mould electronics
40.00 DIS registered
Printed electronics - Part 202-14: Materials - Test methods of conductive ink suitability for screen printing
30.60 Close of voting/ comment period
Printed electronics - Part 202-7: Materials - Printed film - Measurement of peel strength for printed layer on flexible substrate by 90° peel method
20.99 WD approved for registration as CD
Printed electronics - Part 302-7: Equipment - Inkjet - Measurement methods of dot placement evaluation for printed electronics
50.00 Final text received or FDIS registered for formal approval
IEC 62899-302-8 ED1: Printed electronics - Part 302-8: Equipment - Inkjet- Drop Weight Measurement for Drop Size Estimation
40.60 Close of voting