DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Amendment 1 - Installation couplers intended for permanent connection in fixed installations

30.99 CD approved for registration as DIS

TC 23 more

Fragment 1 - Amendment 1 - Installation couplers intended for permanent connection in fixed installations

30.99 CD approved for registration as DIS

TC 23 more

Fragment 2 - Amendment 1 - Installation couplers intended for permanent connection in fixed installations

30.99 CD approved for registration as DIS

TC 23 more

Installation couplers intended for permanent connection in fixed installations - Part 1: Installation couplers for AC-side of photovoltaic (PV) systems

30.99 CD approved for registration as DIS

TC 23 more

Equipment for general lighting purposes - EMC immunity requirements

40.99 Full report circulated: DIS approved for registration as FDIS

TC 34 more

Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 12: Power metering and monitoring devices (PMD)

30.20 CD study/ballot initiated

TC 85 more

Equipment for testing, measuring or monitoring of protective measures, electrical or safety-related parameters in power distribution systems - Part 12-1: Power metering and monitoring devices for DC systems (PMD-DC)

30.20 CD study/ballot initiated

TC 85 more

Equipment for testing, measuring or monitoring of protective measures, electrical or safety-related parameters in power distribution systems – Part 12-2: Functional test procedure for PMD and EPMF

30.60 Close of voting/ comment period

TC 85 more

Equipment for testing, measuring or monitoring of protective measures, electrical or safety-related parameters in power distribution systems – part 18: DC EV supply equipment insulation monitoring device

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 85 more

Equipment for testing, measuring or monitoring of protective measures, electrical or safety-related parameters in power distribution systems - Part 19: Monitoring device for earthing impedance in IT-systems

30.20 CD study/ballot initiated

TC 85 more

Radiation protection instrumentation - Portable, transportable or installed equipment for in vivo measurement of photon emitting radionuclides

30.20 CD study/ballot initiated

TC 45/SC 45B more

Radiation protection instrumentation - Installed, portable or transportable assemblies - Measurement of beam direction and air kerma rate

30.20 CD study/ballot initiated

TC 45/SC 45B more

Amendment 1 - Mechanical structures for electrical and electronic equipment - Tests for IEC 60917 and IEC 60297 series - Part 1: Environmental requirements, test setups and safety aspects

30.99 CD approved for registration as DIS

TC 48/SC 48D more

Insulating liquids - Contamination by polychlorinated biphenyls (PCBs) - Method of determination by capillary column gas chromatography

20.99 WD approved for registration as CD

TC 10 more

Dry, solid insulating materials - Resistance test to high-voltage, low-current arc discharges

40.60 Close of voting

TC 112 more

Aramid pressboard for electrical purposes - Part 1: Definitions, designations and general requirements

20.99 WD approved for registration as CD

TC 15 more

Aramid pressboard for electrical purposes - Part 2: Methods of test

20.99 WD approved for registration as CD

TC 15 more

Low-voltage surge protective devices - Requirements and test methods of SPD monitoring device (SMD)

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 37/SC 37A more