Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Renewable energy off-grid systems - Part 341: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries
40.99 Full report circulated: DIS approved for registration as FDIS
Renewable energy off-grid systems - Part 350: Recommendations for selection of inverters
40.99 Full report circulated: DIS approved for registration as FDIS
Renewable energy and hybrid systems for rural electrification - Part 9-5: Integrated systems - Laboratory evaluation of stand-alone renewable energy products for rural electrification
60.00 Standard under publication
Renewable energy and hybrid systems for rural electrification - Part 9-8: Integrated systems - Requirements for stand-alone renewable energy products with power ratings less than or equal to 350 W
60.00 Standard under publication
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Nickel-cadmium prismatic rechargeable cells with partial gas recombination and batteries for use in industrial applications.
30.20 CD study/ballot initiated
Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines
60.00 Standard under publication
Enterprise-control system integration - Part 2: Object and attributes for enterprise-control system integration
40.00 DIS registered
Enterprise-control system integration — Part 2: Objects and attributes for enterprise-control system integration
30.00 Committee draft (CD) registered
Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration
30.99 CD approved for registration as DIS
Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration
30.00 Committee draft (CD) registered
Enterprise-control system integration - Part 5: Business to manufacturing transactions
30.99 CD approved for registration as DIS
Enterprise-control system integration — Part 5: Business to manufacturing transactions
30.00 Committee draft (CD) registered
<p>Enterprise-control system integration – Part 7 Alias Service Model</p>
20.99 WD approved for registration as CD
Enterprise-control system integration — Part 7: Part 7 Alias Service Model
10.92 Proposal returned to submitter for further definition
High-voltage switchgear and controlgear - Part 201: AC solid-insulation enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
40.99 Full report circulated: DIS approved for registration as FDIS
High-voltage switchgear and controlgear - Part 205: Compact switchgear assemblies, mobile and prefabricated substations for rated voltage above 52 kV
30.60 Close of voting/ comment period
High-voltage switchgear and controlgear - Part 208: Methods to quantify the steady state, power-frequency electromagnetic fields generated by HV switchgear assemblies and HV/LV prefabricated substations, both for rated voltages above 1 kV and up to and including 52 kV
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - High-voltage switchgear and controlgear - Part 213: Voltage detecting and indicating system
30.60 Close of voting/ comment period