Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological characteristics by applying elevated temperature
40.00 DIS registered
Amendment 2 - Safety of machinery - Functional safety of safety-related control systems
40.20 DIS ballot initiated: 12 weeks
Maritime navigation and radiocommunication equipment and systems - Track control systems - Operational and performance requirements, methods of testing and required test results
50.00 Final text received or FDIS registered for formal approval
Fibre optic interconnecting devices and passive components - Fibre optic WDM devices - Part 1: Generic specification
60.00 Standard under publication
Medical device software - Requirements for the safety of radiotherapy treatment planning systems
50.00 Final text received or FDIS registered for formal approval
Audio, video, and related equipment - Determination of power consumption - Part 1: General
30.60 Close of voting/ comment period
Audio, video, and related equipment - Determination of power consumption - Part 2: Signals and media
30.60 Close of voting/ comment period
Audio, video, and related equipment - Determination of power consumption - Part 3: Television sets
30.60 Close of voting/ comment period
Audio, video, and related equipment — Determination of power consumption — Part 8: Small Network Equipment
20.99 WD approved for registration as CD
Low-voltage switchgear and controlgear - Controllers for drivers of stationary fire pumps
20.99 WD approved for registration as CD
Safety of power converters for use in photovoltaic power systems - Part 1: General requirements
30.99 CD approved for registration as DIS
Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters
30.99 CD approved for registration as DIS
Amendment 1 - Safety of power converters for use in photovoltaic power systems - Part 3: Particular requirements for electronic devices in combination with photovoltaic elements
20.99 WD approved for registration as CD
Utility-interconnected photovoltaic inverters - Test procedure of islanding prevention measures
30.60 Close of voting/ comment period
Amendment 1 - Ultrasonics - Hydrophones - Part 3: Properties of hydrophones for ultrasonic fields
40.20 DIS ballot initiated: 12 weeks
Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 1: Protective provisions against electric shock
20.99 WD approved for registration as CD
Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 2: Provisions against the effects of stray currents caused by DC traction systems
20.99 WD approved for registration as CD