Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles -<br /> Part 7: Vehicle adapter
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Managing risk in projects - Application guidelines
50.60 Close of voting. Proof returned by secretariat
Amendment 1 - Measurement procedure for the assessment of specific absorption rate of human exposure to radio frequency fields from hand-held and body-worn wireless communication devices - Human models, instrumentation and procedures (Frequency range of 4 MHz to 10 GHz)
30.99 CD approved for registration as DIS
Measurement procedure for the assessment of specific absorption rate of human exposure to radio frequency fields from hand-held and body-mounted wireless communication devices – Part 3: Vector measurement-based systems (Frequency range of 300 MHz to 6 GHz)
30.60 Close of voting/ comment period
Methods for validation of SAR measurement systems for hand-held and body-mounted wireless communication devices (Frequency range of 4 MHz to 10 GHz)
40.99 Full report circulated: DIS approved for registration as FDIS
Polymeric HV insulators for indoor and outdoor use - General definitions, test methods and acceptance criteria
40.99 Full report circulated: DIS approved for registration as FDIS
Integrated circuits - EMC evaluation of transceivers - Part 3: CAN transceivers
20.99 WD approved for registration as CD
Integrated circuits - EMC evaluation of transceivers - Part 5: Ethernet transceivers
20.99 WD approved for registration as CD
Integrated circuits - EMC evaluation of transceivers - Part 7: CXPI transceivers
30.60 Close of voting/ comment period
Determination of RF field strength, power density and SAR in the vicinity of base stations for the purpose of evaluating human exposure
60.00 Standard under publication
Process management for avionics - Electronic components capability in operation - Part 2: Semiconductor microcircuit lifetime
20.99 WD approved for registration as CD
Nuclear power plants - Main control room - Alarm functions and presentation
20.99 WD approved for registration as CD
Photovoltaic pumping systems - Design qualification and performance measurements
20.99 WD approved for registration as CD
Photovoltaic pumping systems - Part 1: Performance, safety, and durability assessment for small-scale off-grid solar water pumps
20.99 WD approved for registration as CD
Renewable energy and hybrid systems for rural electrification - Part 200: System selection and design
30.20 CD study/ballot initiated
Renewable energy off-grid systems - Part 301: Generators - Integration of solar with other forms of power generation within hybrid power systems
40.99 Full report circulated: DIS approved for registration as FDIS
Renewable energy off-grid systems - Part 341: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries
40.99 Full report circulated: DIS approved for registration as FDIS
Renewable energy off-grid systems - Part 350: Recommendations for selection of inverters
40.99 Full report circulated: DIS approved for registration as FDIS