Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Identification Link - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Guide to designation of current
30.60 Close of voting/ comment period
Low-voltage switchgear and controlgear assemblies - Part 1: General rules
30.60 Close of voting/ comment period
Low-voltage switchgear and controlgear assemblies - Part 6: Busbar trunking systems (busways)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Amendment 1 - Test methods for accessories for power cables with rated voltages from 6 kV (Um = 7,2 kV) up to 30 kV (Um = 36 kV)
50.00 Final text received or FDIS registered for formal approval
Nuclear instrumentation - Scintillation gamma ray detector systems for the assay of radionuclides - Calibration and routine tests
30.60 Close of voting/ comment period
Amendment 1 - Composite hollow insulators - Pressurized and unpressurized insulators for use in electrical equipment with AC rated voltage greater than 1 000 V AC and D.C. voltage greater than 1500V - Definitions, test methods, acceptance criteria and design recommendations
30.99 CD approved for registration as DIS
Live working - Protective clothing against the thermal hazards of an electric arc - Part 2: Requirements
20.99 WD approved for registration as CD
Safety of machinery - Electro-sensitive protective equipment - Part 1: General requirements and tests
50.00 Final text received or FDIS registered for formal approval
Safety of machinery - Electro-sensitive protective equipment - Part 2: Particular requirements for equipment using active opto-electronic protective devices (AOPDs)
50.00 Final text received or FDIS registered for formal approval
Function blocks - Part 2: Software tool requirements
30.99 CD approved for registration as DIS
Function blocks - Part 4: Rules for compliance profiles
30.99 CD approved for registration as DIS
Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 1: General requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 2: Requirements for electrical/electronic/programmable electronic safety-related systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Functional safety of electrical/electronic/programmable electronic safety-related systems Part 2-1: Requirements for semiconductors
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 3: Software requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 4: Definitions and abbreviations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks