DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers

20.99 WD approved for registration as CD

TC 38 më tepër

Instrument transformers - Part 7: Specific requirements for electronic Voltage Transformers

20.99 WD approved for registration as CD

TC 38 më tepër

Instrument transformers - Part 8: Specific requirements for Electronic Current Transformers

20.99 WD approved for registration as CD

TC 38 më tepër

Amendment 1 - Instrument transformers - Part 9: Digital interface for instrument transformers

30.99 CD approved for registration as DIS

TC 38 më tepër

Nuclear instrumentation - Geophysical borehole instrumentation to determine rock density ('density logging')

40.00 DIS registered

TC 45 më tepër

Subsea equipment - Part 2: Power transformers

50.00 Final text received or FDIS registered for formal approval

TC 18 më tepër

Nuclear power plants - Instrumentation important to safety - Determination and maintenance of trip setpoints

30.60 Close of voting/ comment period

TC 45/SC 45A më tepër

Mobile and fixed offshore units - Electrical installations - Part 1: General requirements and conditions

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër

Mobile and fixed offshore units - Electrical installations - Part 2: System design

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër

Mobile and fixed offshore units - Electrical installations - Part 3: Equipment

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër

Mobile and fixed offshore units - Electrical installations - Part 4: Cables

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër

Mobile and fixed offshore units - Electrical installations - Part 5: Mobile units

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër

Mobile and fixed offshore units - Electrical installations - Part 6: Installation

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër

Mobile and fixed offshore units - Electrical installations - Part 7: Hazardous areas

30.20 CD study/ballot initiated

TC 18 më tepër

Tests recommended on cables with a longitudinally applied metal foil for rated voltages above 30 kV (U<sub>m</sub> = 36 kV) up to and including 500 kV (U<sub>m</sub> = 550 kV)

20.99 WD approved for registration as CD

TC 20 më tepër

Amendment 1 - Specification for the testing of balanced and coaxial information technology cabling - Part 2: Cords as specified in ISO/IEC 11801-1 and related standards

40.60 Close of voting

TC 46 më tepër

Specification for the testing of balanced and coaxial information technology cabling - Part 4: Installed balanced single-pair cabling as specified in ISO/IEC 11801-1 and related standards

30.99 CD approved for registration as DIS

TC 46 më tepër

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 0: Principles to be observed in the design and erection of high voltage installations - Safety of high voltage installations

30.60 Close of voting/ comment period

TC 99 më tepër