IEC 62862-3-7 ED1

Solar thermal electric plants - Part 3-7: Requirements and test methods for flexible pipe connectors in parabolic trough collector technology

General information

50.00     Sep 22, 2026

CFDIS    Dec 15, 2026

IEC

TC 117

International Standard

27.160  

Scope

specifies the minimum requirements for the design and verification of the performance of flexible pipe connectors in solar thermal power plants with parabolic trough collector technology. It also includes guidelines or aspects to be considered for the installation of these components in the solar field. In particular, the following are included:
- manufacturer's design requirements, instructions and tests,
- installation requirements for flexible pipe connectors,
- pressure drop test,
- testing of stresses and longitudinal displacements and rotations,
- thermal cycling test,
- life cycle testing,
- maximum torque test,
- leakage verification test.

Life cycle

NOW

IN_DEVELOPMENT
IEC 62862-3-7 ED1
50.00 Final text received or FDIS registered for formal approval
Sep 22, 2026