Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Accuracy test method for static electricity meters under dynamic load conditions
20.99 WD approved for registration as CD
Electricity metering equipment - Particular requirements - Part 21: Static meters for AC active energy (classes 0,5, 1 and 2)
30.20 CD study/ballot initiated
Electricity metering equipment - Particular requirements - Part 22: Static meters for AC active energy (classes 0,1S, 0,2S and 0,5S)
30.20 CD study/ballot initiated
Electricity metering equipment - Particular requirements - Part 23: Static meters for reactive energy (classes 2 and 3)
30.20 CD study/ballot initiated
Electricity metering equipment - Particular requirements - Part 24: Static meters for fundamental component reactive energy (classes 0,5S, 1S, 1, 2 and 3)
30.20 CD study/ballot initiated
Electricity metering equipment - Particular requirements - Part 26: Static revenue grade sub-meters for AC active energy (classes 0,5, 1, 2) and fundamental component reactive energy (classes 0,5S, 1S, 1, 2 and 3)
20.99 WD approved for registration as CD
Amendment 1 - Electricity metering - Payment systems - Part 52: Standard transfer specification (STS) - Physical layer protocol for a two-way virtual token carrier for direct local connection
20.99 WD approved for registration as CD
Electricity metering data exchange - The DLMS®/COSEM suite - Part 5-3: DLMS®/COSEM application layer
20.99 WD approved for registration as CD
Electricity metering data exchange - The DLMS®/COSEM suite - Part 6-1: Object Identification System (OBIS)
20.99 WD approved for registration as CD
Electricity metering data exchange - The DLMS®/COSEM suite - Part 6-2: COSEM interface classes
20.99 WD approved for registration as CD
Electricity metering data exchange - The DLMS/COSEM suite - Part 6-9: Mapping between the Common Information Model message profiles (IEC 61968-9) and DLMS/COSEM (IEC 62056) data models and protocols
20.99 WD approved for registration as CD
Electricity metering data exchange – The DLMS/COSEM suite –<br /> Part 8-11: Communication profile for Wi-SUN field area mesh networks
40.60 Close of voting
Electricity metering data exchange - The DLMS/COSEM suite - Part 8-5: Narrow-band OFDM G3-PLC communication profile for neighbourhood networks
20.99 WD approved for registration as CD
Electricity metering equipment - Dependability - Part 31-1: Accelerated reliability testing - Elevated temperature and humidity
20.99 WD approved for registration as CD
Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological characteristics by applying elevated temperature
40.00 DIS registered
Amendment 2 - Safety of machinery - Functional safety of safety-related control systems
40.20 DIS ballot initiated: 12 weeks
Maritime navigation and radiocommunication equipment and systems - Track control systems - Operational and performance requirements, methods of testing and required test results
40.99 Full report circulated: DIS approved for registration as FDIS