Power cables with Aluminum Conductor for rated voltages 1 kV and 3 kV

00.99 Approval to ballot proposal for new project

TC 18/SC 18A më tepër

Proprioceptive Interaction

00.99 Approval to ballot proposal for new project

TC 100/TA 18 më tepër

Amendment 1 - Household and similar electrical appliances - Accessibility of control elements, doors, lids, drawers and handles

20.99 WD approved for registration as CD

TC 59 më tepër

High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part 1: Common equipment and equipment specific to Line-Commutated Converters

20.99 WD approved for registration as CD

TC 115 më tepër

High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part2: Using voltage sourced converters

20.99 WD approved for registration as CD

TC 115 më tepër

Sound system Equipment – Part 20: Microspeakers

20.99 WD approved for registration as CD

TC 100/TA 20 më tepër

Piezoelectric sensors - Part 1: Generic specifications

60.00 Standard under publication

TC 49 më tepër

Piezoelectric sensors - Part 2: Chemical and biochemical sensors

60.00 Standard under publication

TC 49 më tepër

Piezoelectric Sensors - Part 4: Quartz Crystal Microbalance

30.60 Close of voting/ comment period

TC 49 më tepër

UHV AC transmission systems - Part 101: Voltage regulation and insulation design

20.99 WD approved for registration as CD

TC 122 më tepër

UHV AC transmission systems - Part 201: UHV AC substation design

30.60 Close of voting/ comment period

TC 122 më tepër

Evaluation of Lightning Protection Performance of UHV AC Transmission Lines

50.00 Final text received or FDIS registered for formal approval

TC 122 më tepër

UHV AC transmission systems - Part 302: Commissioning

20.99 WD approved for registration as CD

TC 122 më tepër

Renewable energy power forecasting technology

20.99 WD approved for registration as CD

TC 8/SC 8A më tepër

Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 3: Electrical safety requirements

40.20 DIS ballot initiated: 12 weeks

TC 23 më tepër

Nuclear instrumentation - Data format for list mode digital data acquisition used in radiation detection and measurement

40.20 DIS ballot initiated: 12 weeks

TC 45 më tepër

Mobile Remotely Controlled Systems (MRCS) for nuclear and radiological applications - Particular requirements for ground surveillance

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 45 më tepër

Mobile remotely controlled systems for nuclear and radiological applications - Particular requirements for aerial surveillance

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 45 më tepër