Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Photovoltaics in buildings — Part 3: Evaluation methodology of SHGC for Building integrated photovoltaic modules with various designs
50.60 Close of voting. Proof returned by secretariat
Ferrite cores- Guidelines on dimensions and limits of surface irregularities - Part16: SQ-cores
20.99 WD approved for registration as CD
Grid code compliance assessment methods for grid connection of renewable energy power plants
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electrical installations in ships – Primary and secondary DC distribution, system design architecture
30.60 Close of voting/ comment period
Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality
20.99 WD approved for registration as CD
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 1: Performance
40.60 Close of voting
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 2: Safety
40.60 Close of voting
Information exchange for electric vehicle charging roaming service Part 3: Message structure
30.60 Close of voting/ comment period
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 1: General principles
40.20 DIS ballot initiated: 12 weeks
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 2: Diagram symbols and drawing principles
20.99 WD approved for registration as CD
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 3: Application Function Blocks
30.60 Close of voting/ comment period
Guidance for installation procedures and tolerances of hydroelectric machines – Part 7: Horizontal generators
40.60 Close of voting
Guidance for installation procedures and tolerances of hydroelectric machines – Part 8: Horizontal Francis turbines
40.60 Close of voting
Commercial Electric dishwashing machines - Test methods for measuring the performance
40.20 DIS ballot initiated: 12 weeks
Eyewear display - Part 20-10: Fundamental measurement methods - Optical properties
30.99 CD approved for registration as DIS
Eyewear display - Part 201-10: Optical characteristics of VR type – Singlet lens used for eyepieces
40.00 DIS registered
Eyewear display – Part 23-1: Contact lens type – Generic introduction
20.99 WD approved for registration as CD