Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Fully flexible organic light emitting diode (OLED) panels for general lighting - Performance requirements
60.00 Standard under publication
LED lamps – Safety requirements
50.00 Final text received or FDIS registered for formal approval
LED Light sources – Performance requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Coupled-stress acceleration test sequence for photovoltaic modules and materials
50.60 Close of voting. Proof returned by secretariat
Concentric lay overhead electrical stranded conductors
40.20 DIS ballot initiated: 12 weeks
Measurement of ozone generation from UV-C radiation sources and luminaires
30.60 Close of voting/ comment period
Germicidal equipment - Low-pressure mercury UV radiation sources for germicidal purpose - Safety
40.20 DIS ballot initiated: 12 weeks
Electrical safety of Snow melting photovoltaic (Snow PV) module - Requirements for construction and testing
40.99 Full report circulated: DIS approved for registration as FDIS
Visual comfort of display terminals - Part 1: Introduction
50.00 Final text received or FDIS registered for formal approval
Semiconductor devices - Performance evaluation of semiconductor processing components and inspection equipment - Part 1: Transmittance evaluation method of EUV pellicle
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Semiconductor devices - Performance evaluation of semiconductor processing components and inspection equipment - Part 3: Nano-scale wafer surface inspection method using UV light
40.20 DIS ballot initiated: 12 weeks
Semiconductor devices - Performance evaluation of semiconductor processing components and inspection equipment - Part 4: Evaluation methods for dimensional accuracy of laser dicing process
40.60 Close of voting
Quantum Interconnect – Part 1: Introduction and roadmap for standardization
50.60 Close of voting. Proof returned by secretariat
High-level test description table for development of production test programs
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
High-level test description table for development of production test programs - General Principles
50.00 Final text received or FDIS registered for formal approval
Rotating electrical machines for the traction of road vehicles
40.20 DIS ballot initiated: 12 weeks
Nuclear power plants - Instrumentation, control and electrical power systems - System software vulnerability and system software end-of-support management
40.99 Full report circulated: DIS approved for registration as FDIS