DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Unified power flow controller (UPFC) installations - Part 1: Performance

20.99 WD approved for registration as CD

TC 22/SC 22F more

Unified power flow controller (UPFC) installations - Part 2: System design

30.20 CD study/ballot initiated

TC 22/SC 22F more

200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 45 more

Characteristics of WRGB type displays

30.60 Close of voting/ comment period

TC 100 more

Household appliances network and grid connectivity - Part 1: General requirements, generic data modelling and neutral messages

20.99 WD approved for registration as CD

TC 59 more

Household appliances network and grid connectivity - Part 2: Product specific mappings, details, requirements and deviations

20.99 WD approved for registration as CD

TC 59 more

Household appliances network and grid connectivity - Part 3-1: Specific Data Model Mapping: SPINE and SPINE-IoT

20.99 WD approved for registration as CD

TC 59 more

Household appliances network and grid connectivity - Part 4-1: Communication Protocol Specific Aspects: SPINE, SPINE-IoT and SHIP

20.99 WD approved for registration as CD

TC 59 more

Test method for continuous-switching evaluation of gallium nitride power conversion devices

40.99 Full report circulated: DIS approved for registration as FDIS

TC 47 more

Solar Trackers - Requirements for the protection of personnel

20.99 WD approved for registration as CD

TC 82 more

Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station

40.20 DIS ballot initiated: 12 weeks

TC 80 more

Power system resilience - Part 2:Assessment Guidelines

20.99 WD approved for registration as CD

TC 8/SC 8C more

Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.

30.60 Close of voting/ comment period

TC 37 more

Machine learning-enabled medical device – Performance evaluation process

30.60 Close of voting/ comment period

TC 62 more

Electrical relays - Tests and measurements - Part 0: General and guidance

60.00 Standard under publication

TC 94 more

Electrical relays - Tests and Measurement - Part 26: Crosstalk and insertion loss

30.20 CD study/ballot initiated

TC 94 more

Electrical relays - Tests and measurements - Part 55: Maximum load breaking capacity

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 94 more

Fuse-links with DC rated voltage above 1500 V for the protection of DC circuits with short time constants

30.60 Close of voting/ comment period

TC 32 more