Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Unified power flow controller (UPFC) installations - Part 2: System design
30.20 CD study/ballot initiated
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Household appliances network and grid connectivity - Part 1: General requirements, generic data modelling and neutral messages
20.99 WD approved for registration as CD
Household appliances network and grid connectivity - Part 2: Product specific mappings, details, requirements and deviations
20.99 WD approved for registration as CD
Household appliances network and grid connectivity - Part 3-1: Specific Data Model Mapping: SPINE and SPINE-IoT
20.99 WD approved for registration as CD
Household appliances network and grid connectivity - Part 4-1: Communication Protocol Specific Aspects: SPINE, SPINE-IoT and SHIP
20.99 WD approved for registration as CD
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
40.20 DIS ballot initiated: 12 weeks
Power system resilience - Part 2:Assessment Guidelines
20.99 WD approved for registration as CD
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 0: General and guidance
60.00 Standard under publication
Electrical relays - Tests and Measurement - Part 26: Crosstalk and insertion loss
30.20 CD study/ballot initiated
Electrical relays - Tests and measurements - Part 55: Maximum load breaking capacity
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fuse-links with DC rated voltage above 1500 V for the protection of DC circuits with short time constants
30.60 Close of voting/ comment period
Artificial Intelligence enabled Medical Devices - Computer assisted analysis software for pulmonary images - Algorithm performance test methods
50.00 Final text received or FDIS registered for formal approval