Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage DC auxiliary power systems for substations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage a.c. auxiliary power systems for substations
50.00 Final text received or FDIS registered for formal approval
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 1: High Level Analysis
50.00 Final text received or FDIS registered for formal approval
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis
30.20 CD study/ballot initiated
Photovoltaic direct-driven appliance controllers - Part 1: General requirement
40.99 Full report circulated: DIS approved for registration as FDIS
Household electric appliances - Specification of the properties of a digital system for measuring the performance
40.00 DIS registered
IIoT applications in power distribution systems management: Architecture and functional requirements
30.60 Close of voting/ comment period
Guideline for the planning and design of direct current or hybrid microgrids
30.60 Close of voting/ comment period
LED light source characteristics - Part 1: Data sheets
40.20 DIS ballot initiated: 12 weeks
Fluids for electrotechnical application: Specifications for the re-use of mixtures of gases alternative to SF<sub>6</sub>
40.60 Close of voting
Performance of voltage sourced converter (VSC) based high-voltage direct current (HVDC) transmission - Part 2: Transient conditions
30.20 CD study/ballot initiated
Product category rules for life cycle assessment of electrical and electronic products and systems
60.00 Standard under publication
Carbon footprint calculation applicable to industrial lithium-ion batteries – Part 1: General requirements and methodology
40.99 Full report circulated: DIS approved for registration as FDIS
Materials used in photovoltaic (PV) cells - Part 1: Specifications for electrical characteristics of crystalline silicon wafers
40.99 Full report circulated: DIS approved for registration as FDIS
Quantification and communication of Carbon FootPRINT and GHG emission reductions/avoided emissions from electric and electronic products and systems – Principles, methodologies, requirements and guidance
40.60 Close of voting
Nuclear power plants - Instrumentation systems important to safety - Characteristics and test methods of nuclear reactor reactivity meters
50.00 Final text received or FDIS registered for formal approval
Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages
30.60 Close of voting/ comment period
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
30.20 CD study/ballot initiated