DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Nuclear power plants - Human-machine interfaces - Alarm functions and presentation

40.60 Close of voting

TC 45/SC 45A more

Radiation protection instrumentation - Installed radiation portal monitors (RPMs) for the detection of illicit trafficking of radioactive and nuclear materials

20.99 WD approved for registration as CD

TC 45/SC 45B more

Reed switches - Part 1: Generic specification

30.60 Close of voting/ comment period

TC 94 more

Reed switches - Part 1-1: Generic specification - Blank detail specification

30.60 Close of voting/ comment period

TC 94 more

Reed switches – Part 4: Application in conjunction with magnetic actuator used for magnetic sensing devices

30.60 Close of voting/ comment period

TC 94 more

Photovoltaic pumping systems - Design qualification and performance measurements

20.99 WD approved for registration as CD

TC 82 more

Renewable energy off-grid systems - Part 421: Performance, safety, and durability assessment for small-scale off-grid solar water pumps

20.99 WD approved for registration as CD

TC 82 more

Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement

30.99 CD approved for registration as DIS

TC 4 more

Renewable energy off-grid systems - Part 120: Procurement processes, including tendering and evaluation

20.99 WD approved for registration as CD

TC 82 more

Renewable energy off-grid systems - Part 202: Design for photovoltaic-wind power-diesel generation-energy storage (PV-WP-DG-ES) hybrid off-grid systems

20.99 WD approved for registration as CD

TC 82 more

Renewable energy off-grid systems - Part 310: Silicon solar module visual inspection guide

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Renewable energy off-grid systems - Part 320: Generator set - Off-grid wind turbines

20.99 WD approved for registration as CD

TC 82 more

Renewable energy off-grid systems - Part 330: Generator set - Selection of generator sets for rural electrification systems

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Renewable energy off-grid systems - Part 345: Battery charge controllers for photovoltaic systems - Performance and functioning

30.99 CD approved for registration as DIS

TC 82 more

Renewable energy off-grid systems - Part 410: Laboratory evaluation of lamps and lighting appliances for off-grid electricity systems

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Secondary cells and batteries containing alkaline or other non-acid electrolytes - Nickel-cadmium prismatic rechargeable cells with partial gas recombination and batteries for use in industrial applications

50.60 Close of voting. Proof returned by secretariat

TC 21/SC 21A more

Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration

50.99 FDIS or proof approved for publication

TC 65/SC 65E more

Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration

30.99 CD approved for registration as DIS

ISO/TC 184/SC 5 more