Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Communication networks and systems for power utility automation - Part 80-7: Communication services and data model to support IEC 61850 system management
40.99 Full report circulated: DIS approved for registration as FDIS
Communication networks and systems for power utility automation - Part 90-19: Power system IED communication and associated data models for interoperability - Use of Role-Based Access Control (RBAC) with IEC 61850
50.60 Close of voting. Proof returned by secretariat
Communication networks and systems for power utility automation - Part 90-25: Model updates based on user feedback
40.99 Full report circulated: DIS approved for registration as FDIS
Communication networks and systems for power utility automation - Part 90-28: Specification for subscriber IED to validate received GOOSE and SV messages
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Communication networks and systems for power utility automation - Part 90-29: Physical interfaces of an Intelligent Electronic Device (IED) and its connectivity
30.60 Close of voting/ comment period
Communication networks and systems for power utility automation - Part 90-32: Use of virtualized environment in IEC 61850 power utility automation system
40.99 Full report circulated: DIS approved for registration as FDIS
Communication networks and systems for power utility automation - Part 90-34: Using IEC 61850 for power transformer regulation
20.99 WD approved for registration as CD
Communication networks and systems for power utility automation - Part 90-23: Use of IEC 61850 for microgrid systems
30.20 CD study/ballot initiated
Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
40.99 Full report circulated: DIS approved for registration as FDIS
Communication networks and systems for power utility automation - Part 90-31: Use Cases for Dynamic Data model
30.60 Close of voting/ comment period
Conductive power and energy transfer systems for electric vehicles - Part 1: General system and specific Mode 3 EV charging station requirements
40.60 Close of voting
Conductive power and energy transfer systems for electric vehicles - Part 21-1 Electric vehicle on-board charger EMC requirements for conductive connection to AC/DC supply
50.00 Final text received or FDIS registered for formal approval
Conductive power and energy transfer systems for electric vehicles - Part 21-2: Electric vehicle requirements for conductive connection to an AC/DC supply - EMC requirements for off board electric vehicle charging systems
30.99 CD approved for registration as DIS
Conductive power and energy transfer systems for electric vehicles - Part 23: DC electric vehicle supply equipment
30.60 Close of voting/ comment period
<p>Electric vehicle conductive charging system - Part 23-1: DC electric vehicle supply equipment - Automated connection device</p>
60.00 Standard under publication
Electric vehicle conductive charging system - Part 23-3: DC electric vehicle supply equipment - Megawatt charging systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive power and energy transfer systems for electric vehicles - Part 23-4: Portable DC EV supply equipment
30.60 Close of voting/ comment period
Conductive power and energy transfer systems for electric vehicles - Part 24: Digital communication between a DC EV supply equipment and an electric vehicle for control of DC charging
30.60 Close of voting/ comment period