Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electricity metering data exchange - The DLMS®/COSEM suite - Part 6-2: COSEM interface classes
20.99 WD approved for registration as CD
Electricity metering data exchange - The DLMS/COSEM suite - Part 6-9: Mapping between the Common Information Model message profiles (IEC 61968-9) and DLMS/COSEM (IEC 62056) data models and protocols
20.99 WD approved for registration as CD
Electricity metering data exchange – The DLMS/COSEM suite –<br /> Part 8-11: Communication profile for IPv6 RF mesh field area networks
60.00 Standard under publication
Electricity metering data exchange - The DLMS/COSEM suite - Part 8-5: Communication profile for G3-PLC and G3-Hybrid neighbourhood area networks
20.99 WD approved for registration as CD
Test equipment, techniques and procedures for electrical energy meters - Part 2 Portable meter test units (PMTUS)
20.99 WD approved for registration as CD
Electricity metering equipment - Dependability - Part 31-1: Accelerated reliability testing - Elevated temperature and humidity
30.60 Close of voting/ comment period
Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological characteristics by applying elevated temperature
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - Medical device software - Requirements for the safety of radiotherapy treatment planning systems
40.20 DIS ballot initiated: 12 weeks
Audio, video, and related equipment - Determination of power consumption - Part 1: General
30.99 CD approved for registration as DIS
Audio, video, and related equipment - Determination of power consumption - Part 2: Signals and media
30.99 CD approved for registration as DIS
Audio, video, and related equipment - Determination of power consumption - Part 3: Television sets
30.99 CD approved for registration as DIS
Audio, video, and related equipment — Determination of power consumption — Part 8: Small Network Equipment
40.00 DIS registered
Low-voltage switchgear and controlgear - Controllers for drivers of stationary fire pumps
30.20 CD study/ballot initiated
Safety of power converters for use in photovoltaic power systems - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - Safety of power converters for use in photovoltaic power systems - Part 3: Particular requirements for electronic devices in combination with photovoltaic elements
20.99 WD approved for registration as CD
Utility-interconnected photovoltaic inverters - Test procedure of islanding prevention measures
20.99 WD approved for registration as CD
Interpretation Sheet 1 - Ultrasonics - Hydrophones - Part 1: Measurement and characterization of medical ultrasonic fields
50.00 Final text received or FDIS registered for formal approval