DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Thermal standardization on semiconductor packages - Part 6-2: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a measurement data of semiconductor device

20.99 WD approved for registration as CD

TC 47/SC 47D more

Power system stability and security management - Design and implement of automatic system - Coordinated Automatic Voltage Control for Power System with High Penetration of IBR (Inverter based Resource)

20.99 WD approved for registration as CD

TC 8/SC 8C more

Black start of hydropower plant

50.00 Final text received or FDIS registered for formal approval

TC 4 more

Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)

30.20 CD study/ballot initiated

TC 23/SC 23K more

Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)

30.60 Close of voting/ comment period

TC 23/SC 23K more

High-voltage test techniques - Capacitance and dielectric loss measurements

50.00 Final text received or FDIS registered for formal approval

TC 42 more

Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 3 more

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

60.00 Standard under publication

TC 23/SC 23H more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 4: Interface protection and fault ride through

30.99 CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

30.99 CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing

30.99 CD approved for registration as DIS

TC 87 more

Fixed accessories intended for household and similar purposes that supply power through an interface

50.00 Final text received or FDIS registered for formal approval

TC 23/SC 23B more

Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices

40.99 Full report circulated: DIS approved for registration as FDIS

TC 47 more

Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems

20.99 WD approved for registration as CD

SyC AAL more

RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria

40.99 Full report circulated: DIS approved for registration as FDIS

TC 36 more