Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
TR 63330-2: Repurposing of secondary batteries - Part 2: Classification of batteries to be repurposed - Safety and performance estimation methods
30.60 Close of voting/ comment period
Assessment of circular content in products - Part 3: Proportion of recycled materials (Proposed Horizontal Publication)
30.20 CD study/ballot initiated
Electronic displays for special applications - Part 2: Elevator and escalator
50.60 Close of voting. Proof returned by secretariat
Electronic displays for special applications - Part 3: Gaming and e-sports
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electronic displays for special applications - Part 4: Public information and signage
20.99 WD approved for registration as CD
Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application
20.99 WD approved for registration as CD
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell power system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - Fuel cell systems for rolling stock - Part 3: Performance test methods for fuel cell power system
50.60 Close of voting. Proof returned by secretariat
Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements
50.00 Final text received or FDIS registered for formal approval
Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage DC auxiliary power systems for substations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage a.c. auxiliary power systems for substations
50.00 Final text received or FDIS registered for formal approval
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 1: High Level Analysis
50.00 Final text received or FDIS registered for formal approval
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis
30.20 CD study/ballot initiated
Photovoltaic direct-driven appliance controllers - Part 1: General requirement
40.99 Full report circulated: DIS approved for registration as FDIS
Household electric appliances - Specification of the properties of a digital system for measuring the performance
40.00 DIS registered
IIoT applications in power distribution systems management: Architecture and functional requirements
30.60 Close of voting/ comment period
Guideline for the planning and design of direct current or hybrid microgrids
30.60 Close of voting/ comment period