DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

TR 63330-2: Repurposing of secondary batteries - Part 2: Classification of batteries to be repurposed - Safety and performance estimation methods

30.60 Close of voting/ comment period

TC 21 more

Assessment of circular content in products - Part 3: Proportion of recycled materials (Proposed Horizontal Publication)

30.20 CD study/ballot initiated

TC 111 more

Electronic displays for special applications - Part 2: Elevator and escalator

50.60 Close of voting. Proof returned by secretariat

TC 110 more

Electronic displays for special applications - Part 3: Gaming and e-sports

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 110 more

Electronic displays for special applications - Part 4: Public information and signage

20.99 WD approved for registration as CD

TC 110 more

Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application

20.99 WD approved for registration as CD

TC 110 more

Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell power system

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 9 more

Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 9 more

Railway applications - Fuel cell systems for rolling stock - Part 3: Performance test methods for fuel cell power system

50.60 Close of voting. Proof returned by secretariat

TC 105 more

Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements

50.00 Final text received or FDIS registered for formal approval

PC 127 more

Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage DC auxiliary power systems for substations

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

PC 127 more

Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage a.c. auxiliary power systems for substations

50.00 Final text received or FDIS registered for formal approval

PC 127 more

Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 1: High Level Analysis

50.00 Final text received or FDIS registered for formal approval

SyC Smart Cities more

Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis

30.20 CD study/ballot initiated

SyC Smart Cities more

Photovoltaic direct-driven appliance controllers - Part 1: General requirement

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Household electric appliances - Specification of the properties of a digital system for measuring the performance

40.00 DIS registered

TC 59/SC 59K more

IIoT applications in power distribution systems management: Architecture and functional requirements

30.60 Close of voting/ comment period

TC 57 more

Guideline for the planning and design of direct current or hybrid microgrids

30.60 Close of voting/ comment period

TC 8/SC 8B more