Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Nuclear power plants - Instrumentation, control and electrical power systems - System software vulnerability and system software end-of-support management
40.99 Full report circulated: DIS approved for registration as FDIS
Design principles and validation methods for the maintenance of microbial control for non-disposable fluid paths of dialysis equipment
20.99 WD approved for registration as CD
Prosumer plugs and prosumer inlets for household and similar purposes - Part 1: General requirements –
20.99 WD approved for registration as CD
Prosumer plugs and prosumer inlets for household and similar purposes - Part 2: Standard sheets and gauges
20.99 WD approved for registration as CD
Semiconductor devices - The recognition criteria of defects in indium phosphide epitaxial wafers - Part 1: Classification of defects
40.60 Close of voting
LOW-VOLTAGE FUSES: Product data and properties for information exchange
30.20 CD study/ballot initiated
Reference Guidance for Energy Service Business Using Thermal Energy Storage System
30.60 Close of voting/ comment period
Ultrasonics – Field characterization – Measurement-based simulation in water and other media
30.60 Close of voting/ comment period
Ultrasonics - Field characterization - Specification and measurement of field parameters at high pressure therapeutic levels in water
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Cold storage equipment for medical use - Part 2-1: Refrigerating and freezing storage cabinets - Performance requirements and test methods
40.20 DIS ballot initiated: 12 weeks
Cold storage equipment for medical use - Part 2-2: Cryogenic liquid nitrogen storage equipment - Performance requirements and test methods
20.99 WD approved for registration as CD
Cold storage equipment for medical use - Part 2-3: (Semi-) automatic refrigerating and freezing cold store- performance requirements and test methods
20.99 WD approved for registration as CD
Secondary sodium-ion cells for the propulsion of electric road vehicles - Part 1: Performance testing
30.60 Close of voting/ comment period
Secondary sodium-ion cells for the propulsion of electric road vehicles - Part 2: Safety requirements and test methods
30.60 Close of voting/ comment period
Part model guideline for electronic-device packages - XML requirements (Fast track)
40.60 Close of voting
Composite insulated cross-arms with AC rated voltage greater than 1 000 V and DC voltage greater than 1 500 V – Definitions, design criteria, test methods and acceptance criteria
20.99 WD approved for registration as CD