Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Design evaluation of PV cable supported system
20.99 WD approved for registration as CD
Tracking systems for radioactive materials - Specific requirement of electronic tagging system
50.00 Final text received or FDIS registered for formal approval
Secondary lithium batteries for light EV (electric vehicle) applications - Part 1: General safety requirements and test methods
20.99 WD approved for registration as CD
Photovoltaic (PV) modules - Test method for ultraviolet-induced degradation - Part 1: Crystalline Silicon
50.00 Final text received or FDIS registered for formal approval
Synchronization of metadata in the content delivery chain
50.00 Final text received or FDIS registered for formal approval
Environmental aspects for lighting - Product specific rules - Part 1: Luminaires
30.60 Close of voting/ comment period
Germicidal equipment - Germicidal UV handheld devices - Safety requirements
30.20 CD study/ballot initiated
24/7 Carbon Free Energy standardization pathways
30.60 Close of voting/ comment period
Test method to assess resistance of PV modules to foot traffic during installation or maintenance
20.99 WD approved for registration as CD
General requirements for tap adapter of capacitance graded bushing
20.99 WD approved for registration as CD
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for secondary sodium ion cells and batteries for use in industrial applications
30.60 Close of voting/ comment period
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Secondary sodium ion cells and batteries for use in industrial applications
30.60 Close of voting/ comment period
Guidelines for qualifying PV modules for operation in floating solar platforms
20.99 WD approved for registration as CD
<p>Electric vehicle conductive charging system - AC Vehicle-to-Load Device and Interface to the electric vehicle</p>
30.60 Close of voting/ comment period
Electric power system restoration - Part 1: general guidelines
30.20 CD study/ballot initiated
Electric power system restoration – Part 2-1: Resource planning – Use of VSC-HVDC for system restoration
20.99 WD approved for registration as CD