DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 3: Basic operations

50.00 Final text received or FDIS registered for formal approval

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

30.99 CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support

30.20 CD study/ballot initiated

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 7: Information exchange

20.99 WD approved for registration as CD

TC 82 more

Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification

40.99 Full report circulated: DIS approved for registration as FDIS

TC 45/SC 45A more

Artificial pollution tests on high-voltage insulators made of hydrophobicity transfer materials to be used on a.c. and d.c. systems

50.00 Final text received or FDIS registered for formal approval

TC 36 more

Guidance and plan to develop smart energy ontologies

60.00 Standard under publication

SyC Smart Energy more

Fixed accessories intended for household and similar purposes that supply power through an interface

40.00 DIS registered

TC 23/SC 23B more

Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices

40.99 Full report circulated: DIS approved for registration as FDIS

TC 47 more

Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems

20.99 WD approved for registration as CD

SyC AAL more

Nuclear Power Plants - Instrumentation and control systems important to safety - Cable assemblies for harsh environment purposes

40.60 Close of voting

TC 45/SC 45A more

Guideline for the adjustment potential evaluation of demand side resources

20.99 WD approved for registration as CD

TC 8/SC 8B more

Optical fibre cables – Microduct technology – Guidance

50.00 Final text received or FDIS registered for formal approval

TC 86/SC 86A more

Room temperature vulcanising (RTV) silicone rubber for outdoor insulators

20.99 WD approved for registration as CD

TC 36 more

Communication Standards Mapping

30.60 Close of voting/ comment period

SyC COMM more

Nuclear facilities - Human machine interfaces - Operator support systems

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 45/SC 45A more

Insulation tests and insulation resistance threshold

40.99 Full report circulated: DIS approved for registration as FDIS

TC 18 more