Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers
60.00 Standard under publication
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
30.20 CD study/ballot initiated
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
50.00 Final text received or FDIS registered for formal approval
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
50.60 Close of voting. Proof returned by secretariat
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
50.00 Final text received or FDIS registered for formal approval
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 6: Power control functions and grid support
40.99 Full report circulated: DIS approved for registration as FDIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
40.99 Full report circulated: DIS approved for registration as FDIS
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
30.99 CD approved for registration as DIS
Fixed accessories intended for household and similar purposes that supply power through an interface
50.00 Final text received or FDIS registered for formal approval
Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices
40.99 Full report circulated: DIS approved for registration as FDIS
Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems
20.99 WD approved for registration as CD
RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria
40.99 Full report circulated: DIS approved for registration as FDIS
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection
40.00 DIS registered
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots — Part 3‑21: Overhead transmission line inspection robot - General requirements
20.99 WD approved for registration as CD