DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Guideline for retrofilling mineral oil immersed transformers up to 72,5 kV with ester-based insulating liquids

50.00 Final text received or FDIS registered for formal approval

TC 10 more

Fibre optic interconnecting devices and passive components – Performance Standard for Railway Rolling Stock Application – Part 1: General and Guidance

40.99 Full report circulated: DIS approved for registration as FDIS

TC 86/SC 86B more

General guidance on the discharge of decommissioned batteries for recycling

20.99 WD approved for registration as CD

TC 21 more

Low-voltage switchgear and controlgear - Determination, verification and validation of safety-related performance characteristics

50.60 Close of voting. Proof returned by secretariat

TC 121/SC 121A more

Wind load calculation for rooftop PV installation

20.99 WD approved for registration as CD

TC 82 more

NFC Forum Specifications - Part 1: NFC Wireless Charging

60.00 Standard under publication

TC 100 more

NFC Forum Specifications - Part 2: NFC Data Exchange Format

60.00 Standard under publication

TC 100 more

Cellulosic/non-cellulosic mixed paper and non-cellulosic paper used as capacitor separators

20.99 WD approved for registration as CD

TC 15 more

Technical Guidelines for the Function and Project Design of AC-to-DC Line Conversions

30.20 CD study/ballot initiated

TC 8/SC 8C more

Quantum technologies – Terminology and quantities – General vocabulary

20.99 WD approved for registration as CD

IEC/ISO JTC 3 more

General Guideline for the Carbon Emission Monitoring and Assessment in Interconnected Electric Power Systems

20.99 WD approved for registration as CD

TC 8/SC 8C more

Internet of Things - Part 1: IoT application for long-distance oil and gas pipelines

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 65 more

Internet of Things – Part 2: IoT applications for natural gas distribution system

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 65 more

Internet of Things – Part 3: Technical requirements of gas pressure regulating IoT system for use in gas distribution

30.60 Close of voting/ comment period

TC 65 more

Guidance for active assisted living (AAL) services based on smart speakers in the connected home environment (CHE)

50.00 Final text received or FDIS registered for formal approval

SyC AAL more

Collaboration between AAL users and AAL systems

20.99 WD approved for registration as CD

SyC AAL more

Digitalization of Carbon Footprint of Products (CFP) – Part 1: Exchange data model for carbon footprint of products

30.20 CD study/ballot initiated

TC 3/SC 3D more

Digitalization of Carbon Footprint of Products (CFP) - Part 2: Format and Guidance for Exchanging CFP Data

20.99 WD approved for registration as CD

TC 111 more