Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Lighting systems - Electro-mechanical interfaces - Part 2-3: ANS seven-contact twist-lock interface including Type ZB18N
20.99 WD approved for registration as CD
Railway application - Interoperability and safety requirements for dynamic wireless power transfer systems - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Interconnection of converter-based resources with power systems - Part 1: Grid connection requirements with bulk power systems
20.99 WD approved for registration as CD
Interconnection of converter-based resources with power systems - Part 10: Framework for the capability and performance of grid forming functions
20.99 WD approved for registration as CD
Interconnection of converter-based resources with power systems - Part 2: General requirements for marine energy generation
20.99 WD approved for registration as CD
Unified power flow controller (UPFC) installations - Part 1: Performance
30.20 CD study/ballot initiated
Unified power flow controller (UPFC) installations - Part 2: System design
30.60 Close of voting/ comment period
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
50.00 Final text received or FDIS registered for formal approval
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
40.00 DIS registered
Power system resilience - Part 2:Assessment Guidelines
20.99 WD approved for registration as CD
Fixed folding durability test method for flexible opto-electric circuit boards
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 0: General and guidance
50.60 Close of voting. Proof returned by secretariat