Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Cold storage equipment for medical use - Part 2-2: Cryogenic liquid nitrogen storage equipment - Performance requirements and test methods
20.99 WD approved for registration as CD
Secondary sodium-ion cells for the propulsion of electric road vehicles - Part 1: Performance testing
30.20 CD study/ballot initiated
Secondary sodium-ion cells for the propulsion of electric road vehicles - Part 2: Safety requirements and test methods
30.20 CD study/ballot initiated
Part model guideline for electronic-device packages - XML requirements (Fast track)
40.20 DIS ballot initiated: 12 weeks
Composite insulated cross-arms with AC rated voltage greater than 1 000 V and DC voltage greater than 1 500 V – Definitions, design criteria, test methods and acceptance criteria
20.99 WD approved for registration as CD
Industrial networks – 5G communication technology – Part 1: Terms, definitions and fundamentals
40.99 Full report circulated: DIS approved for registration as FDIS
Industrial networks – 5G communication technology – Part 3: Specification of features needed for industrial automation
20.99 WD approved for registration as CD
Industrial networks – 5G communication technology– Part 4: Specification for the deployment of 5G in an IA plant
20.99 WD approved for registration as CD
Replay Tools for radioactive material detection systems
30.60 Close of voting/ comment period
Application of IEC 63339 to Smart Manufacturing Reference Models
50.00 Final text received or FDIS registered for formal approval
Application of IEC 63339 to smart manufacturing reference models
30.99 CD approved for registration as DIS
Plugs, socket-outlets, ship couplers for low-voltage shore connection systems (LVSC-systems) in Direct Current (DC)
30.20 CD study/ballot initiated
Guidelines for joint control for hydroelectric power plants
20.99 WD approved for registration as CD
Evaluation of hydrophobicity retention of polymeric insulating materials under high voltage stress with the dynamic drop test
40.00 DIS registered
Arc hazards and safety aspects in LVDC power distribution system – Part 1: Series arc characteristics between brass and copper-alloy electrodes
30.60 Close of voting/ comment period
Performance of power electronic transformer for flexible transmission and distribution systems
50.00 Final text received or FDIS registered for formal approval
Grid compliance test for photovoltaic power plants
20.99 WD approved for registration as CD
Hazard analysis due to using C-UAS system in nuclear site
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks