Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Semiconductor devices - Semiconductor devices for IoT system - Part 2: Test method of semiconductor photon sources incorporating human factors for wearable equipment
30.99 CD approved for registration as DIS
Live working – Guidance for risk assessment, selection, use, care and maintenance of personal protective equipment against the hazards of an electric arc
50.00 Final text received or FDIS registered for formal approval
Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages
50.99 FDIS or proof approved for publication
Thermal standardization on semiconductor packages - Part 2-3: 3D thermal simulation models of semiconductor packages for steady-state analysis - LQFP packages
20.99 WD approved for registration as CD
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
50.99 FDIS or proof approved for publication
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
60.00 Standard under publication
Thermal standardization on semiconductor packages - Part 6-2: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a measurement data of semiconductor device
20.99 WD approved for registration as CD
Power system stability and security management - Design and implement of automatic system - Coordinated Automatic Voltage Control for Power System with High Penetration of IBR (Inverter based Resource)
20.99 WD approved for registration as CD
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
60.00 Standard under publication
Black start of hydropower plant
50.00 Final text received or FDIS registered for formal approval
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
30.20 CD study/ballot initiated
Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers
60.00 Standard under publication
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
30.20 CD study/ballot initiated
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
50.00 Final text received or FDIS registered for formal approval
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
50.60 Close of voting. Proof returned by secretariat
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
50.00 Final text received or FDIS registered for formal approval
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD