Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Off grid and unreliable grid refrigerating appliances for domestic and light commercial use - Characteristics and test methods - Performance requirements and energy consumption
40.20 DIS ballot initiated: 12 weeks
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection
30.60 Close of voting/ comment period
Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment
30.99 CD approved for registration as DIS
Guidelines for the assessment of rodent resistance for optical fibre cable
50.00 Final text received or FDIS registered for formal approval
Distributed Energy Resource Aggregation Business System: Architecture and Service scenario
40.99 Full report circulated: DIS approved for registration as FDIS
Distributed Energy Resource Aggregation Business System - Part 2: Risk assessment and treatment
20.99 WD approved for registration as CD
Industrial networks – Ethernet-APL port profile / Ethernet-SPE profile specification
30.20 CD study/ballot initiated
System referencing conductor switching device
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low and Ultra-low Latency communication and control systems
40.20 DIS ballot initiated: 12 weeks
Testing of Artificial Intelligence / Machine Learning-enabled Medical Devices
30.60 Close of voting/ comment period
Power conditioners efficiency with partially shaded photovoltaic generators
20.99 WD approved for registration as CD
Household and similar electrical appliances – Subsequent safety testing after repair, refurbishment, and remanufacturing – Part 1 – General requirements
60.00 Standard under publication
High Pressure Water Jet Machines - Safety - Part 1: High Pressure Water Jet Unit
40.60 Close of voting
High Pressure Water Jet Machines - Safety - Part 2: High Pressure hoses, hose lines and connectors
40.60 Close of voting
High Pressure Water Jet Machines - Safety - Part 3: High Pressure Spraying Device
40.60 Close of voting
Systems Reference Deliverable (SRD) Template for Smart Manufacturing Use Cases
30.60 Close of voting/ comment period
Maritime battery system - Part 1: Secondary lithium cells and batteries - Safety requirements
30.99 CD approved for registration as DIS