Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Nanomanufacturing - Material specifications - Part 3-3: Graphene-based material - Blank detail specification: Monolayer graphene
20.99 WD approved for registration as CD
Nanomanufacturing - Material specifications - Part 3-5: Graphene - Blank detail specification: Powders and powders in dispersion
30.60 Close of voting/ comment period
Nanomanufacturing - Product specification - Part 3-7: Graphene-related products - Blank detail specification: graphene-based heat dissipating film
20.99 WD approved for registration as CD
Nanomanufacturing - Product specification - Part 3-8: Graphene-related products - Detail specification: graphene-based heat dissipating film
30.60 Close of voting/ comment period
Nanomanufacturing - Product specification - Part 4-3: Nanophotonic products - Blank detail specification: quantum dot enabled light emitting diodes
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Nanomanufacturing - Product specification - Part 5-4: Nano-enabled energy storage - Blank detail specification: carbon nanomaterials for the electrodes of hybrid supercapacitors
30.60 Close of voting/ comment period
<p>Nanomanufacturing - Product specification - Part 5-5: Nanoenabled energy storage - Detail specification: graphene - carbon nanotube suspension as conductive agent for the electrodes of Lithium ion batteries</p>
40.99 Full report circulated: DIS approved for registration as FDIS
Electronic railway equipment - On-board multimedia and telematic subsystems for railways - Part 1: General architecture
20.99 WD approved for registration as CD
Nuclear power plants - Instrumentation and control important to safety - Electrical equipment condition monitoring methods - Part 5: Optical time domain reflectometry
40.60 Close of voting
Power quality measurement in power supply systems - Part 1: Power quality instruments (PQI)
30.20 CD study/ballot initiated
Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements
30.20 CD study/ballot initiated
Railway applications - Electronic power converters for fixed installations - Part 2-2: DC applications - Controlled converters
60.00 Standard under publication
Railway applications - Electronic power converters for fixed installations - Part 3-2: AC traction applications - Static frequency converter
40.99 Full report circulated: DIS approved for registration as FDIS
Display lighting unit - Part 2-1: Electro-optical measuring methods of LED backlight unit
30.20 CD study/ballot initiated
Display lighting unit - Part 2-4: Electro-optical measuring methods of laser module
30.20 CD study/ballot initiated
Alarm systems - Part 1: Environmental test methods (Fast Track)
30.99 CD approved for registration as DIS
Alarm systems - Part 2: Electromagnetic compatibility - Immunity requirements for components of fire and security alarm systems (Fast Track)
30.99 CD approved for registration as DIS
Guideline for Research and Development of Small/ Tiny Wave Energy Converters
20.99 WD approved for registration as CD