Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
50.99 FDIS or proof approved for publication
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
60.00 Standard under publication
Thermal standardization on semiconductor packages - Part 6-2: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a measurement data of semiconductor device
20.99 WD approved for registration as CD
Power system stability and security management - Design and implement of automatic system - Coordinated Automatic Voltage Control for Power System with High Penetration of IBR (Inverter based Resource)
20.99 WD approved for registration as CD
Black start of hydropower plant
50.00 Final text received or FDIS registered for formal approval
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
30.20 CD study/ballot initiated
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
30.60 Close of voting/ comment period
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
50.00 Final text received or FDIS registered for formal approval
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
60.00 Standard under publication
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
40.99 Full report circulated: DIS approved for registration as FDIS
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
30.99 CD approved for registration as DIS
Fixed accessories intended for household and similar purposes that supply power through an interface
50.00 Final text received or FDIS registered for formal approval
Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices
40.99 Full report circulated: DIS approved for registration as FDIS
Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems
20.99 WD approved for registration as CD