Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Assessment of circular content in products - Part 3: Proportion of recycled materials (Proposed Horizontal Publication)
30.20 CD study/ballot initiated
Electronic displays for special applications - Part 2: Elevator and escalator
50.60 Close of voting. Proof returned by secretariat
Electronic displays for special applications - Part 3: Gaming and e-sports
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electronic displays for special applications - Part 4: Public information and signage
20.99 WD approved for registration as CD
Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application
20.99 WD approved for registration as CD
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell power system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - Fuel cell systems for rolling stock - Part 3: Performance test methods for fuel cell power system
50.60 Close of voting. Proof returned by secretariat
Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements
50.00 Final text received or FDIS registered for formal approval
Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage DC auxiliary power systems for substations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage a.c. auxiliary power systems for substations
50.00 Final text received or FDIS registered for formal approval
Smart city use case collection and analysis - Management of public health emergencies in smart cities - Part 1: High level analysis
50.00 Final text received or FDIS registered for formal approval
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis
30.20 CD study/ballot initiated
Photovoltaic direct-driven appliance controllers - Part 1: General requirement
40.99 Full report circulated: DIS approved for registration as FDIS
Household electric appliances - Specification of the properties of a digital system for measuring the performance
40.00 DIS registered
IIoT applications in power distribution systems management: Architecture and functional requirements
30.60 Close of voting/ comment period
Guideline for the planning and design of direct current or hybrid microgrids
30.60 Close of voting/ comment period
LED light source characteristics - Part 1: Data sheets
40.20 DIS ballot initiated: 12 weeks