DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Information technology – Brain–computer interfaces – Vocabulary

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/IEC JTC 1/SC 43 më tepër

Optical fibre cables - Part 8: Optical fibre cables for use in automotive applications - Sectional specification

10.60 Close of voting

TC 86/SC 86A më tepër

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – FIBRE OPTIC CONNECTOR INTERFACES – Part 35: Type LSHE connector series for harsh environments

00.99 Approval to ballot proposal for new project

TC 86/SC 86B më tepër

Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components

00.99 Approval to ballot proposal for new project

TC 86/SC 86B më tepër

Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced Macro bend multimode fibre – Part 3-XX: Connector parameters of physically contacting 50 μm core diameter fibres – Non-angled polyphenylene sulphide rectangular ferrules with a single row of 16 fibres for reference connector applications

10.60 Close of voting

TC 86/SC 86B më tepër

Fibre optic active components and devices – Performance Standards – Part 13: Performance specification template for pump laser diode modules

10.20 New project ballot initiated

TC 86/SC 86C më tepër

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00 Proposal for new project received

TC 87 më tepër

Wind Energy Generation Systems – Part 18: Design Guideline for Pitch Bearings

00.00 Proposal for new project received

TC 88 më tepër

Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield

10.60 Close of voting

TC 88 më tepër

Wind energy generation systems - Part 80: Airborne Wind Energy Systems (AWES) (proposed IEC TS 61400-80)

10.20 New project ballot initiated

TC 88 më tepër

Wind Energy Generation Systems - Part 33: Bird mortality prevention strategies. Bird Detection and Identification Systems

00.00 Proposal for new project received

TC 88 më tepër

Generic EMT Simulation Models of Converter-based Power Plants for Power System Dynamic Analysis

10.60 Close of voting

TC 8/SC 8A më tepër

Roadmap of grid integration of renewable energy generation

00.00 Proposal for new project received

TC 8/SC 8A më tepër

General requirements for grid-forming control of renewable energy

00.00 Proposal for new project received

TC 8/SC 8A më tepër

Guideline for the black start of offshore wind farms grid-connected via VSC-HVDC

00.00 Proposal for new project received

TC 8/SC 8A më tepër

Coordinated Automatic Voltage Control for Power System with High Penetration of IBR(Inverter-based resource)

00.00 Proposal for new project received

TC 8/SC 8C më tepër

General Guidance on Renewable Energy Acquisition in Interconnected Electric Power Systems

00.00 Proposal for new project received

TC 8/SC 8C më tepër

Primary Frequency Coordinated Control Framework of System with High Penetration of Inverter Based Generation

00.00 Proposal for new project received

TC 8/SC 8C më tepër