Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electrical relays - Tests and measurement - Part 34: Fluid contamination
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and measurements - Part 4: Dielectric strength test
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and Measurements - Part 41: Insulation coordination
40.60 Close of voting
Electrical relays - Tests and Measurements - Part 42: EMC
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 43: Proof tracking index (PTI)
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and Measurements - Part 45: Maximum frequency of operation
60.00 Standard under publication
Electrical relays - Tests and Measurements - Part 46: Impulse voltage test
40.00 DIS registered
Electrical relays - Tests and Measurements - Part 52: Coil overvoltage
40.60 Close of voting
Electrical relays - Tests and measurements - Part 54: Critical DC load current test
50.60 Close of voting. Proof returned by secretariat
Electrical Relays - Tests and measurements - Part 55: Maximum load breaking capacity
30.60 Close of voting/ comment period
Artificial Intelligence enabled Medical Devices - Computer assisted analysis software for pulmonary images - Algorithm performance test methods
30.60 Close of voting/ comment period
Gap Analysis on Standards Related to City Information Modelling and Urban Digital Twins
20.99 WD approved for registration as CD
Gap Analysis on Standards Related to City Information Modelling and Urban Digital Twins
10.99 New project approved
Safe management and operation of electrical installations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Multimedia systems – Haptics - Haptics stimuli descriptors
60.00 Standard under publication
DC side harmonics & filtering in HVDC transmission systems
50.00 Final text received or FDIS registered for formal approval