Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Household appliances network and grid connectivity - Part 4-1: Communication Protocol Specific Aspects: SPINE, SPINE-IoT and SHIP
20.99 WD approved for registration as CD
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
40.20 DIS ballot initiated: 12 weeks
Power system resilience - Part 2:Assessment Guidelines
20.99 WD approved for registration as CD
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 0: General and guidance
60.00 Standard under publication
Electrical relays - Tests and Measurement - Part 26: Crosstalk and insertion loss
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 55: Maximum load breaking capacity
50.60 Close of voting. Proof returned by secretariat
Fuse-links with DC rated voltage above 1500 V for the protection of DC circuits with short time constants
30.60 Close of voting/ comment period
Artificial Intelligence enabled Medical Devices - Computer assisted analysis software for pulmonary images - Algorithm performance test methods
50.00 Final text received or FDIS registered for formal approval
Reuse of PV modules and circular economy
40.99 Full report circulated: DIS approved for registration as FDIS
Gap analysis on standards related to city information modelling and urban digital twins
50.60 Close of voting. Proof returned by secretariat
Gap Analysis on Standards Related to City Information Modelling and Urban Digital Twins
30.60 Close of voting/ comment period
Electricity market - Market Catalogue for Stable Grid Operation.
50.00 Final text received or FDIS registered for formal approval
Electricity market - Business Use Cases (BUCs) of Flexibility Services
20.99 WD approved for registration as CD
Specification for evaluation of renewable energy power forecasting results
30.20 CD study/ballot initiated