Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 1: Definitions, Requirements and Use Cases
40.60 Close of voting
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 2: Data models Protocols, Messages
20.99 WD approved for registration as CD
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 3: Conformance tests
20.99 WD approved for registration as CD
Power System Stability Control – Part 2: Guideline for quantitative assessment of power system stability and security
30.20 CD study/ballot initiated
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
30.99 CD approved for registration as DIS
Developing a profile composed of a set of Basic Application Profiles (BAPs) of IEC 61850 for DER compliant to IEEE 1547
20.99 WD approved for registration as CD
Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets
20.99 WD approved for registration as CD
Sustainable management of waste electrical and electronic equipment (e-waste) - Proposed Horizontal Publication
40.60 Close of voting
Technical Specification for Black Start of Hydropower Plant
20.99 WD approved for registration as CD
Nuclear facilities - Instrumentation, control and electrical power systems important to safety - Structure of the IEC SC 45A standards series
50.00 Final text received or FDIS registered for formal approval
Energy efficiency systems - Smart grid - Application specification - Interface and framework for customer; Interface between the CEM and Home/Building Resource manager - General Requirements and Architecture
40.99 Full report circulated: DIS approved for registration as FDIS
Energy Efficiency Systems - Smart Grid - Customer Energy Management Systems - Interface between the Energy Management Gateway and BEM / CEM - Data model and messaging
20.99 WD approved for registration as CD
Energy efficiency systems - Smart grid - Customer energy management systems - Interface between the home/building CEM and resource manager(s) - Data model and messaging
30.99 CD approved for registration as DIS
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
20.99 WD approved for registration as CD
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Generic RMS simulation models of inverter-based generators for power system dynamic analysis
50.00 Final text received or FDIS registered for formal approval
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
40.00 DIS registered