Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electronic displays for special applications - Part 1: General introduction
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electronic displays for special applications - Part 2: Elevator and escalator
40.99 Full report circulated: DIS approved for registration as FDIS
Electronic displays for special applications - Part 3: Gaming and e-sports
40.99 Full report circulated: DIS approved for registration as FDIS
Electronic displays for special applications - Part 4: Public information and signage
20.99 WD approved for registration as CD
Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application
20.99 WD approved for registration as CD
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell system
40.99 Full report circulated: DIS approved for registration as FDIS
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system
40.99 Full report circulated: DIS approved for registration as FDIS
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 3: Performance test methods for fuel cell power system
40.99 Full report circulated: DIS approved for registration as FDIS
Low-voltage auxiliary power systems - Part 1-1: Terminology
50.60 Close of voting. Proof returned by secretariat
Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements
30.60 Close of voting/ comment period
Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage d.c. auxiliary power systems for substations
50.00 Final text received or FDIS registered for formal approval
Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage a.c. auxiliary power systems for substations
30.60 Close of voting/ comment period
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 1: High Level Analysis
30.60 Close of voting/ comment period
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis
20.99 WD approved for registration as CD
Photovoltaic direct-driven appliance controllers - Part 1: General requirement
40.20 DIS ballot initiated: 12 weeks
Household electric appliances - Specification of the properties of a digital system for measuring the performance
30.60 Close of voting/ comment period
IIoT applications in power distribution systems management: Architecture and functional requirements
20.99 WD approved for registration as CD
Guideline for the Planning and Design of DC or Hybrid Microgrids
30.60 Close of voting/ comment period