DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Electronic displays for special applications - Part 1: General introduction

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 110 më tepër

Electronic displays for special applications - Part 2: Elevator and escalator

40.99 Full report circulated: DIS approved for registration as FDIS

TC 110 më tepër

Electronic displays for special applications - Part 3: Gaming and e-sports

40.99 Full report circulated: DIS approved for registration as FDIS

TC 110 më tepër

Electronic displays for special applications - Part 4: Public information and signage

20.99 WD approved for registration as CD

TC 110 më tepër

Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application

20.99 WD approved for registration as CD

TC 110 më tepër

Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell system

40.99 Full report circulated: DIS approved for registration as FDIS

TC 9 më tepër

Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system

40.99 Full report circulated: DIS approved for registration as FDIS

TC 9 më tepër

Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 3: Performance test methods for fuel cell power system

40.99 Full report circulated: DIS approved for registration as FDIS

TC 105 më tepër

Low-voltage auxiliary power systems - Part 1-1: Terminology

50.60 Close of voting. Proof returned by secretariat

PC 127 më tepër

Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements

30.60 Close of voting/ comment period

PC 127 më tepër

Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage d.c. auxiliary power systems for substations

50.00 Final text received or FDIS registered for formal approval

PC 127 më tepër

Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage a.c. auxiliary power systems for substations

30.60 Close of voting/ comment period

PC 127 më tepër

Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 1: High Level Analysis

30.60 Close of voting/ comment period

SyC Smart Cities më tepër

Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis

20.99 WD approved for registration as CD

SyC Smart Cities më tepër

Photovoltaic direct-driven appliance controllers - Part 1: General requirement

40.20 DIS ballot initiated: 12 weeks

TC 82 më tepër

Household electric appliances - Specification of the properties of a digital system for measuring the performance

30.60 Close of voting/ comment period

TC 59/SC 59K më tepër

IIoT applications in power distribution systems management: Architecture and functional requirements

20.99 WD approved for registration as CD

TC 57 më tepër

Guideline for the Planning and Design of DC or Hybrid Microgrids

30.60 Close of voting/ comment period

TC 8/SC 8B më tepër