DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Wind energy generation systems - Part 12-5: Power performance - Assessment of obstacles and terrain

30.60 Close of voting/ comment period

TC 88 më tepër

Wind energy generation systems - Part 12-6: Measurement based nacelle transfer function of electricity producing wind turbines

30.60 Close of voting/ comment period

TC 88 më tepër

Wind energy generation systems - Part 12-80: Power performance measurements of electricity producing Airborne Wind Energy Systems (AWES)

20.99 WD approved for registration as CD

TC 88 më tepër

Amendment 1 - Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines

40.60 Close of voting

TC 88 më tepër

Wind energy generation systems – Part 16: Standard format for sharing power curves and associated information.

40.20 DIS ballot initiated: 12 weeks

TC 88 më tepër

Wind energy generation systems - Part 2: Micro, small, and medium wind turbines

20.99 WD approved for registration as CD

TC 88 më tepër

Wind energy generation systems - Part 21-5: Configuration, functional specification, and validation of hardware-in-the-loop test bench for wind power plants

20.99 WD approved for registration as CD

TC 88 më tepër

Wind energy generation systems - Part 23: Full-scale structural testing of rotor blades

30.60 Close of voting/ comment period

TC 88 më tepër

Wind energy generation systems - Part 24: Lightning protection

20.99 WD approved for registration as CD

TC 88 më tepër

Wind energy generation systems - Part 27-1: Simulation models for grid connection – Generic fundamental frequency models

20.99 WD approved for registration as CD

TC 88 më tepër

Wind energy generation systems - Part 27-2: Simulation models for grid connection – Validation of fundamental frequency models

20.99 WD approved for registration as CD

TC 88 më tepër

Wind energy generation systems - Part 27-3: Structure and validation procedure of frequency domain models for harmonic propagation studies

20.99 WD approved for registration as CD

TC 88 më tepër

Wind energy generation systems - Part 27-4: Structure and validation procedure of Electromagnetic Transients (EMT) models

20.99 WD approved for registration as CD

TC 88 më tepër

Decommissioning and preparation for recycling

50.00 Final text received or FDIS registered for formal approval

TC 88 më tepër

Wind energy generation systems - Part 3-1: Design requirements for fixed offshore wind turbines

20.99 WD approved for registration as CD

TC 88 më tepër

Amendment 1 - Wind energy generation systems - Part 3-2: Design requirements for floating offshore wind turbines

30.99 CD approved for registration as DIS

TC 88 më tepër

Wind energy generation systems - Part 30: Safety of wind turbine generators - General principles for design

30.60 Close of voting/ comment period

TC 88 më tepër

Wind energy generation systems - Part 32: Operations and maintenance of blades

20.99 WD approved for registration as CD

TC 88 më tepër