Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Dynamic characteristics of inverter-based resources in bulk power systems Part 2: Multi-frequency control interactions
20.99 WD approved for registration as CD
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
30.60 Close of voting/ comment period
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
30.60 Close of voting/ comment period
High-voltage test techniques - Capacitance and dielectric loss measurements
50.00 Final text received or FDIS registered for formal approval
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
60.00 Standard under publication
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 4: Interface protection and fault ride through
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
40.20 DIS ballot initiated: 12 weeks
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
40.99 Full report circulated: DIS approved for registration as FDIS
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
30.99 CD approved for registration as DIS
Fixed accessories intended for household and similar purposes that supply power through an interface
50.60 Close of voting. Proof returned by secretariat
Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices
40.99 Full report circulated: DIS approved for registration as FDIS
RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria
50.00 Final text received or FDIS registered for formal approval
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection
40.60 Close of voting
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots — Part 3‑21: Overhead transmission line inspection robot - General requirements
20.99 WD approved for registration as CD
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3‑31: Land cable tunnel inspection robot - General requirements.
30.20 CD study/ballot initiated
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3-41: Wheeled lifting inspection robot for distribution substation General requirement, test methods and acceptance criteria
30.20 CD study/ballot initiated