DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

30.99 CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 3: Basic operations

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

30.99 CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 7: Information exchange

20.99 WD approved for registration as CD

TC 82 more

Grid connection of offshore wind via VSC-HVDC systems

50.60 Close of voting. Proof returned by secretariat

TC 8/SC 8A more

Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification

40.20 DIS ballot initiated: 12 weeks

TC 45/SC 45A more

Artificial pollution tests on high-voltage insulators made of hydrophobicity transfer materials to be used on a.c. and d.c. systems

30.60 Close of voting/ comment period

TC 36 more

Guide and plan to develop Smart energy Ontologies

50.00 Final text received or FDIS registered for formal approval

SyC Smart Energy more

Fixed accessories intended for household and similar purposes that supply power through an interface

30.99 CD approved for registration as DIS

TC 23/SC 23B more

Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices

40.60 Close of voting

TC 47 more

Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems

20.99 WD approved for registration as CD

SyC AAL more

Nuclear Power Plants - Instrumentation and control systems important to safety - Cable assemblies for harsh environment purposes

40.20 DIS ballot initiated: 12 weeks

TC 45/SC 45A more

Validation of dynamic power control and exposure time-averaging algorithms, Part 1: Cellular network implementations for SAR at frequencies up to 6 GHz

60.00 Standard under publication

TC 106 more

Guideline for the adjustment potential evaluation of demand side resources

20.99 WD approved for registration as CD

TC 8/SC 8B more

Data container format for wearable sensor

60.00 Standard under publication

TC 100/TA 18 more