Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Photovoltaic modules - Extended-stress testing - Part 1: Modules
20.99 WD approved for registration as CD
Durability test methods for electronic displays - Part 2-21: Environmental tests - Test methods for heat and humidity
60.00 Standard under publication
Durability test methods for electronic displays - Part 3-3:Mechanical tests - Dynamic stress
20.99 WD approved for registration as CD
Power quality management - Part 1: General guidelines
30.60 Close of voting/ comment period
Power quality management - Part 101: Power quality data application
50.60 Close of voting. Proof returned by secretariat
Power quality management - Part 4: Harmonic analysis on public electric power network
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Management of network assets in power systems - Overview, principles and terminology
40.00 DIS registered
Management of network assets in power systems - Risk-informed decision-making process
30.60 Close of voting/ comment period
Management of network assets in power systems - Management aspect
60.00 Standard under publication
Fatigue assessment of hydraulic turbine runners: from design to quality assurance
40.20 DIS ballot initiated: 12 weeks
Live working - Hand protective devices against the thermal hazards of an electric arc - Part 2: Requirements
20.99 WD approved for registration as CD
Radio frequency beam wireless power transfer (WPT) for mobile devices
50.00 Final text received or FDIS registered for formal approval
Electric motor-operated tools - Dust measurement procedure - Part 2-19: Particular requirements for hand-held jointers
40.99 Full report circulated: DIS approved for registration as FDIS
Electric motor-operated tools - Dust measurement procedure - Part 3-3: Particular requirements for transportable planers and thicknessers
40.99 Full report circulated: DIS approved for registration as FDIS
Electric motor-operated tools - Dust measurement procedure - Part 3-9: Particular requirements for transportable mitre saws
50.99 FDIS or proof approved for publication
CDD Database - Cable tray systems and cable ladder systems
20.99 WD approved for registration as CD
Power line communication for DC shutdown equipment - Communication signal, physical layer
50.60 Close of voting. Proof returned by secretariat
Winding wires - Test methods - Electrical endurance under high frequency voltage impulses
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks