Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment
40.20 DIS ballot initiated: 12 weeks
Guidelines for the assessment of rodent resistance for optical fibre cables
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Distributed Energy Resource Aggregation Business - Part 2: Risk assessment and treatment
20.99 WD approved for registration as CD
Testing of Artificial Intelligence / Machine Learning-enabled Medical Devices
40.60 Close of voting
Railway applications - Cybersecurity
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Maritime battery system - Part 1: Secondary lithium cells and batteries - Safety requirements
40.99 Full report circulated: DIS approved for registration as FDIS
<p>Protective devices based on semiconductor technology for household and similar use - Part 1: Semiconductor Residual current operated Circuit-Breakers with integral Overcurrent protection for household and similar uses (SC-RCBOs)</p>
30.60 Close of voting/ comment period
Calibration and quality control in the use of radionuclide calibrators
50.60 Close of voting. Proof returned by secretariat
Leaky waveguides - Part 2: Sectional specification for elliptical leaky waveguides
50.99 FDIS or proof approved for publication
Leaky waveguide - Part 3: Sectional specification for rigid rectangular leaky waveguides
30.99 CD approved for registration as DIS
Systems Reference Document (SRD) Use Case Collection and Analysis: LVDC Systems for Public Electricity Distribution and distribution microgrids
20.99 WD approved for registration as CD
Cooking fume extractors - Methods for measuring the capture efficiency
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Smart city system ontology – Part 2: Guidance on ontology management for smart cities
50.00 Final text received or FDIS registered for formal approval
Smart city system ontology – Part 4: Ontology for Positive Energy Districts
40.99 Full report circulated: DIS approved for registration as FDIS
Railway applications – Fixed installations – Coordination requirements and energy-saving performance evaluation for energy feedback equipment in DC traction systems
40.99 Full report circulated: DIS approved for registration as FDIS
Assessment of Human Exposure to Electromagnetic Fields from Radiative Wireless Power Transfer Systems: Measurement and Computational Methods (Frequency Range of 30 MHz to 300 GHz)
30.99 CD approved for registration as DIS
Accessibility goals and needs with an exemplar of use with a household voice control system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Methods for spectral imaging performance evaluation of computed tomography
60.00 Standard under publication