Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF Data Exchange System (VDES) - Shipborne mobile station - Operational and performance requirements, methods of test and required test results
20.99 WD approved for registration as CD
Fixed folding durability test method for flexible opto-electric circuit boards
40.00 DIS registered
Wearable electronic textiles - Test methods for performance of heating products - Heating temperature and power consumption
40.20 DIS ballot initiated: 12 weeks
Wearable electronic textiles - Test methods for performance of heating products - Heating temperature and power consumption
40.20 DIS ballot initiated: 12 weeks
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.20 CD study/ballot initiated
Electrical relays - Tests and Measurements - Part 0: General and Guidance
40.60 Close of voting
Electrical relays – Tests and measurements - Part 1: Visual inspection and check of dimensions
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and measurements - Part 10: Heating
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and measurements - Part 19: Electrical endurance
40.99 Full report circulated: DIS approved for registration as FDIS
Electrical relays - Tests and Measurements - Part 21: Thermal Endurance
60.00 Standard under publication
Electrical relays - Tests and Measurement - Part 26: Crosstalk and insertion loss
30.60 Close of voting/ comment period
Electrical relays - Tests and Measurements - Part 3: Relay coil properties
40.60 Close of voting
Electrical relays - Tests and measurements - Part 30: Contact sticking (delayed release)
60.00 Standard under publication
Electrical relays - Tests and measurements - Part 31: Magnetic remanence
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and measurements - Part 33: Continuity of protective earthing connection
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and measurement - Part 34: Fluid contamination
50.60 Close of voting. Proof returned by secretariat