Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support
30.60 Close of voting/ comment period
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
30.20 CD study/ballot initiated
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
20.99 WD approved for registration as CD
Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification
40.99 Full report circulated: DIS approved for registration as FDIS
Artificial pollution tests on high-voltage polymeric insulators to be used on AC and DC systems
50.00 Final text received or FDIS registered for formal approval
Fixed accessories intended for household and similar purposes that supply power through an interface
40.20 DIS ballot initiated: 12 weeks
Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices
40.99 Full report circulated: DIS approved for registration as FDIS
Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems
20.99 WD approved for registration as CD
Nuclear Power Plants - Instrumentation and control systems important to safety - Cable assemblies for harsh environment purposes
40.60 Close of voting
Guideline for the adjustment potential evaluation of demand side resources
30.20 CD study/ballot initiated
Optical fibre cables – Microduct technology – Guidance
50.00 Final text received or FDIS registered for formal approval
Room temperature vulcanising (RTV) silicone rubber for outdoor insulators
20.99 WD approved for registration as CD
Nuclear facilities - Human machine interfaces - Operator support systems
50.60 Close of voting. Proof returned by secretariat
Insulation tests and insulation resistance threshold
40.99 Full report circulated: DIS approved for registration as FDIS
Off grid and unreliable grid refrigerating appliances for domestic and light commercial use - Characteristics and test methods - Performance requirements and energy consumption
40.60 Close of voting
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection
30.60 Close of voting/ comment period
Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment
30.99 CD approved for registration as DIS