Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Guideline for the planning and design of direct current or hybrid microgrids
30.60 Close of voting/ comment period
LED light source characteristics - Part 1: Data sheets
40.20 DIS ballot initiated: 12 weeks
Fluids for electrotechnical application: Specifications for the re-use of mixtures of gases alternative to SF<sub>6</sub>
40.99 Full report circulated: DIS approved for registration as FDIS
Performance of voltage sourced converter (VSC) based high-voltage direct current (HVDC) transmission - Part 2: Transient conditions
30.20 CD study/ballot initiated
Carbon footprint calculation applicable to industrial lithium-ion batteries – Part 1: General requirements and methodology
40.99 Full report circulated: DIS approved for registration as FDIS
Materials used in photovoltaic (PV) cells - Part 1: Specifications for electrical characteristics of crystalline silicon wafers
50.00 Final text received or FDIS registered for formal approval
Quantification and communication of Carbon FootPRINT and GHG emission reductions/avoided emissions from electric and electronic products and systems – Principles, methodologies, requirements and guidance
40.60 Close of voting
Nuclear power plants - Instrumentation systems important to safety - Characteristics and test methods of nuclear reactor reactivity meters
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages
30.99 CD approved for registration as DIS
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
30.99 CD approved for registration as DIS
Thermal standardization on semiconductor packages - Part 6: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points
40.20 DIS ballot initiated: 12 weeks
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
30.60 Close of voting/ comment period
Vehicle connector, vehicle inlet and cable assembly for Megawatt DC charging
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
<p>Standard Interface for Connecting Charging Stations to Local Energy Management Systems - Part 2 Specific Data Model Mapping</p>
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Standard interface for connecting charging stations to local energy management systems - Part 3 Communication protocol and cybersecurity specific aspects
60.00 Standard under publication
<p>Standard Interface for Connecting Charging stations to Local Energy Management Systems - Part-4 Test Specifications</p>
20.99 WD approved for registration as CD
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 1: Definitions, Requirements and Use Cases
50.00 Final text received or FDIS registered for formal approval
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 2: Data models Protocols, Messages
20.99 WD approved for registration as CD