DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

30.99 CD approved for registration as DIS

TC 65/SC 65C more

Security for automation and control systems – Part 1-1: Overview and Guidance for the IEC 62443 Series

30.60 Close of voting/ comment period

TC 65 more

Security for industrial automation and control systems - Part 2-4: Security program requirements for IACS service providers

30.60 Close of voting/ comment period

TC 65 more

Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements

30.60 Close of voting/ comment period

TC 65 more

Security for Automation and Control Systems - Part 6-1: Security evaluation methodology for IEC 62443-2-4

30.99 CD approved for registration as DIS

TC 65 more

Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 3: Photovoltaic modules and plants - Outdoor infrared thermography

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Photovoltaic (PV) system - Requirements for testing, documentation and maintenance - Part 4: Photovoltaic modules and plants - Outdoor electroluminescence imaging

50.00 Final text received or FDIS registered for formal approval

TC 82 more

Amendment 1 - Photobiological safety of lamps and lamp systems - Part 7: Light sources and luminaires primarily emitting visible radiation

30.99 CD approved for registration as DIS

TC 34 more

Material declaration for products of and for the electrotechnical industry

20.99 WD approved for registration as CD

TC 111 more

Safety requirements for power electronic converter systems and equipment - Part 2: High Voltage Power electronic converters up to 36 kV a.c. or 54 kV d.c.

40.60 Close of voting

TC 22 more

High voltage test techniques - Measurement of partial discharges by electromagnetic and acoustic methods

20.99 WD approved for registration as CD

TC 42 more

Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead contact line (to achieve free access)

40.99 Full report circulated: DIS approved for registration as FDIS

TC 9 more

Broadband systems operating over EHV/HV/MV/LV electricity grids

00.00 Proposal for new project received

TC 57 more

Industrial systems, installations and equipment and industrial products - Labelling of cables and cores

40.99 Full report circulated: DIS approved for registration as FDIS

TC 3 more

Industrial process control devices - Radiation thermometers - Part 1: Technical data for radiation thermometers

30.99 CD approved for registration as DIS

TC 65/SC 65B more

Industrial process control devices - Radiation thermometers - Part 2: Determination of the technical data for radiation thermometers

30.99 CD approved for registration as DIS

TC 65/SC 65B more