Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Industrial automation equipment and systems – Part 2: Algorithm Verification Methods
20.99 WD approved for registration as CD
Binary power generation systems - Part 3-1: Safety requirements - System with less than 500 kW in capacity
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Asset Administration Shell for Industrial Applications – Part 2: Information meta model
30.60 Close of voting/ comment period
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
20.99 WD approved for registration as CD
Asset administration shell for industrial applications - Part 4: Use cases and modelling examples
30.60 Close of voting/ comment period
Asset Administration Shell for industrial applications – Part 5: Interfaces
20.99 WD approved for registration as CD
Automation engineering of modular systems in the process industry – General concept and interfaces
20.99 WD approved for registration as CD
E-Transporters – Part 2-2: Safety requirements and test methods for autonomous cargo e-Transporters
30.99 CD approved for registration as DIS
IEC TR 63282-101 LVDC systems: DC power distribution system for typical scenarios
30.20 CD study/ballot initiated
IEC TR 63282-102 LVDC systems: Technical report for low-voltage DC electric island power supply systems
30.60 Close of voting/ comment period
Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases
40.99 Full report circulated: DIS approved for registration as FDIS
Industrial-process measurement, control and automation – Smart Manufacturing – Part 4:Recommendations for the usage of new technologies
30.60 Close of voting/ comment period
Energy Storage Power Converter (ESPC) Sub-System for use in Electrical Energy Storage Systems (EESS) - Part 3: Method of specifying the performance and test requirements
20.99 WD approved for registration as CD
Semiconductor devices - Generic semiconductor qualification guidelines - Part 3: Guidelines for reliability qualification plans for power semiconductor module
40.20 DIS ballot initiated: 12 weeks
Semiconductor devices - Guidelines for reliability qualification plans - Part 4: Early failure assessment
20.99 WD approved for registration as CD
Wireless Power Transfer - Measuring method for wireless power transfer efficiency and standby power - mobile phone (TA 15)
30.60 Close of voting/ comment period
Supplementary requirements for intelligent assemblies
60.00 Standard under publication
Mechanical vibration - Measurement and evaluation of machine vibration - Machine sets in hydraulic power generating and pump-storage plants
20.99 WD approved for registration as CD