Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Smart city use case collection and analysis - Managing public health emergencies in smart cities - Part 1: High level analysis
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Smart city use case collection and analysis - Management of Public Health Emergencies in Smart Cities - Part 2 : Use Case Analysis
30.60 Close of voting/ comment period
Photovoltaic direct-driven appliance controllers - Part 1: General requirement
40.99 Full report circulated: DIS approved for registration as FDIS
Household electric appliances - Specification of the properties of a digital system for measuring the performance
40.20 DIS ballot initiated: 12 weeks
IIoT applications in power distribution systems management: Architecture and functional requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Guideline for the planning and design of direct current or hybrid microgrids
30.60 Close of voting/ comment period
LED light source characteristics - Part 1: Data sheets
40.20 DIS ballot initiated: 12 weeks
Fluids for electrotechnical application: Specifications for the re-use of mixtures of gases alternative to SF<sub>6</sub>
40.99 Full report circulated: DIS approved for registration as FDIS
Performance of voltage sourced converter (VSC) based high-voltage direct current (HVDC) transmission - Part 2: Transient conditions
30.60 Close of voting/ comment period
Semiconductor devices - Semiconductor devices for IoT system - Part 2: Test method of semiconductor photon sources incorporating human factors for wearable equipment
20.99 WD approved for registration as CD
Carbon footprint calculation applicable to industrial lithium-ion batteries – Part 1: General requirements and methodology
40.99 Full report circulated: DIS approved for registration as FDIS
Materials used in photovoltaic (PV) cells - Part 1: Specifications for electrical characteristics of crystalline silicon wafers
50.00 Final text received or FDIS registered for formal approval
Quantification and communication of Carbon FootPRINT and GHG emission reductions/avoided emissions from electric and electronic products and systems – Principles, methodologies, requirements and guidance (Proposed horizontal standard)
40.99 Full report circulated: DIS approved for registration as FDIS
Nuclear power plants - Instrumentation systems important to safety - Characteristics and test methods of nuclear reactor reactivity meters
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages
30.99 CD approved for registration as DIS
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
30.99 CD approved for registration as DIS
Thermal standardization on semiconductor packages - Part 6: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points
40.20 DIS ballot initiated: 12 weeks
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
30.60 Close of voting/ comment period