DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65 more

Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases

50.00 Final text received or FDIS registered for formal approval

TC 65 more

Industrial-process measurement, control and automation – Smart Manufacturing – Part 4:Recommendations for the usage of new technologies

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65 more

Energy Storage Power Converter (ESPC) Sub-System for use in Electrical Energy Storage Systems (EESS) - Part 3: Method of specifying the performance and test requirements

20.99 WD approved for registration as CD

TC 22/SC 22H more

Semiconductor devices - Generic semiconductor qualification guidelines - Part 3: Guidelines for reliability qualification plans for power semiconductor module

40.99 Full report circulated: DIS approved for registration as FDIS

TC 47 more

Semiconductor devices - Guidelines for reliability qualification plans - Part 4: Early failure assessment

40.20 DIS ballot initiated: 12 weeks

TC 47 more

High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 1: Guideline

20.99 WD approved for registration as CD

TC 115 more

High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 2: Parameter lists

20.99 WD approved for registration as CD

TC 115 more

Portable multimedia equipment – Determination of battery duration – Part 3: Wearable powered loudspeaker equipment

40.60 Close of voting

TC 100/TA 19 more

Smart city use case collection and analysis - Water systems in smart cities - Part 2 : Use case analysis

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

SyC Smart Cities more

Smart city use case collection and analysis - Intelligent operations centre for smart cities - Part 2 : Use case analysis

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

SyC Smart Cities more

Measurement methods of the complex relative permeability and permittivity of noise suppression sheet

20.99 WD approved for registration as CD

TC 51 more

Measurement methods of the complex relative permeability and permittivity of noise suppression sheet

20.99 WD approved for registration as CD

TC 51 more

Audio/video, information and communication technology equipment – safety – dc power transfer between ict equipment ports using ict wiring and cables at voltages not exceeding 60 v dc

30.99 CD approved for registration as DIS

TC 108 more

Audio/Video, Information and Communication Technology Equipment – Safety – Power transfer between Communications equipment ports using Communications cabling at ≥ 60 Vd.c. and AC

50.00 Final text received or FDIS registered for formal approval

TC 108 more

Low-voltage direct current (LVDC) industry applications

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

SyC LVDC more

A meta-modelling analysis approach to smart manufacturing reference models

60.00 Standard under publication

TC 65 more

Medical electrical equipment - Functional performance characteristics for X-ray-based image-guided radiotherapy equipment

10.60 Close of voting

TC 62/SC 62C more