Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electrical insulation systems (EIS) - Thermal evaluation of combined liquid and solid components - Part 2: Simplified test
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Noise suppression sheet for digital devices and equipment - Part 2: Measuring methods
30.20 CD study/ballot initiated
Automation systems in the process industry – Commissioning of electrical, instrumentation and control systems
40.99 Full report circulated: DIS approved for registration as FDIS
Organic light emitting diode (OLED) displays - Part 6-4: Measuring methods of transparent properties
40.20 DIS ballot initiated: 12 weeks
Power systems management and associated information exchange - Data and communications security - Part 100-3: Conformance test cases for the IEC 62351-3, the secure communication extension for profiles including TCP/IP
30.60 Close of voting/ comment period
Power systems management and associated information exchange - Data and communications security - Part 14: Cyber security event logging
40.99 Full report circulated: DIS approved for registration as FDIS
Power systems management and associated information exchange - Data and communications security - Part 15: Deep Packet Inspection (DPI) of encrypted communications
20.99 WD approved for registration as CD
Power systems management and associated information exchange - Data and communications security - Part 16: Profiles for Ethernet security, MACsec (IEC 62351-16)
20.99 WD approved for registration as CD
Power systems management and associated information exchange - Data and communications security - Part 8-1: Role-based access control - Definition of roles and permissions for engineering
50.60 Close of voting. Proof returned by secretariat
Power systems management and associated information exchange - Data and communications security - Part 90-4: Migration of cryptographic algorithms
50.00 Final text received or FDIS registered for formal approval
Power systems management and associated information exchange - Interoperability in the long term - Part 102: CIM - IEC 61850 harmonization
30.99 CD approved for registration as DIS
Power systems management and associated information exchange - Interoperability in the long term - Part 104: CIM Profiles to JSON Schema Mapping
30.60 Close of voting/ comment period
Selection of optical fibre cable specifications relative to mechanical, ingress, climatic or electromagnetic characteristics - Guidance
50.60 Close of voting. Proof returned by secretariat
Hydraulic machines - Guidelines for dealing with hydro-abrasive erosion in Kaplan, Francis and Pelton turbines
40.99 Full report circulated: DIS approved for registration as FDIS
Medical devices - Part 2: Guidance on the application of usability engineering to medical devices
40.99 Full report circulated: DIS approved for registration as FDIS
Medical devices — Part 2: Guidance on the application of usability engineering to medical devices
30.60 Close of voting/ comment period
Medical devices – Part 3: Guidance for artificial intelligence-enabled medical devices
20.99 WD approved for registration as CD