Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Measurement methods of the complex relative permeability and permittivity of noise suppression sheet
20.99 WD approved for registration as CD
Audio/video, information and communication technology equipment – safety – dc power transfer between ict equipment ports using ict wiring and cables at voltages not exceeding 60 v dc
30.99 CD approved for registration as DIS
Audio/Video, Information and Communication Technology Equipment – Safety – Power transfer between Communications equipment ports using Communications cabling at ≥ 60 Vd.c. and AC
50.00 Final text received or FDIS registered for formal approval
Low-voltage direct current (LVDC) industry applications
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
A meta-modelling analysis approach to smart manufacturing reference models
60.00 Standard under publication
Security of ME equipment containing high-activity sealed radioactive sources
60.00 Standard under publication
City needs analysis framework
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
TR 63330-2: Repurposing of secondary batteries - Part 2: Classification of batteries to be repurposed - Safety and performance estimation methods
30.60 Close of voting/ comment period
Assessment of circular content in products - Part 3: Proportion of recycled materials (Proposed Horizontal Publication)
30.60 Close of voting/ comment period
Electronic displays for special applications - Part 3: Gaming and e-sports
60.00 Standard under publication
Electronic displays for special applications - Part 4: Public information and signage
20.99 WD approved for registration as CD
Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application
20.99 WD approved for registration as CD
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell power system
50.60 Close of voting. Proof returned by secretariat
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system
50.60 Close of voting. Proof returned by secretariat
Railway applications - Fuel cell systems for rolling stock - Part 3: Performance test methods for fuel cell power system
50.60 Close of voting. Proof returned by secretariat
Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements
50.00 Final text received or FDIS registered for formal approval
Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage DC auxiliary power systems for substations
50.60 Close of voting. Proof returned by secretariat
Low-voltage auxiliary power systems - Part 2-3: Design criteria - Low-voltage AC auxiliary power systems for substations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks