Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
HVDC Installations - Guidelines on Asset Management
20.99 WD approved for registration as CD
Safety of machinery - Safety-related sensors used for the protection of persons
30.60 Close of voting/ comment period
Medical devices – Part 3: Guidance on the application of usability engineering to medical devices using artificial intelligence and machine learning technology
10.20 New project ballot initiated
Medical electrical equipment - Functional performance characteristics for X-ray-based image-guided radiotherapy equipment
10.60 Close of voting
Medical electrical equipment -- Part 2-xx: Part 2-XX : Particular requirements for basic safety and essential performance of non-invasive arterial tonometer equipment
10.60 Close of voting
Information technology - Brain-computer Interfaces - Overview of ethical and societal concerns
00.00 Proposal for new project received
Evaluation of Lightning Protection Performance of UHV AC Transmission Lines
20.99 WD approved for registration as CD
Power cables with Aluminum Conductor for rated voltages 1 kV and 3 kV
00.99 Approval to ballot proposal for new project
Interoperability specifications and communication method for external power supplies used with computing and consumer electronics devices
60.00 Standard under publication
High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part 1: Common equipment and equipment specific to Line-Commutated Converters
20.99 WD approved for registration as CD
High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part2: Using voltage sourced converters
20.99 WD approved for registration as CD
Piezoelectric sensors - Part 1: Generic specifications
40.20 DIS ballot initiated: 12 weeks
Piezoelectric sensors - Part 2: Chemical and biochemical sensors
40.20 DIS ballot initiated: 12 weeks
Piezoelectric sensors - Part 3: Physical sensors
40.20 DIS ballot initiated: 12 weeks
UHV AC transmission systems - Security and stability requirements for system planning and design
50.00 Final text received or FDIS registered for formal approval
UHV AC transmission systems - Part 201: UHV AC substation design
20.99 WD approved for registration as CD