DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Medical electrical equipment -- Part 2-xx: Part 2-XX : Particular requirements for basic safety and essential performance of non-invasive arterial tonometer equipment

10.60 Close of voting

TC 62/SC 62D më tepër

Evaluation of Lightning Protection Performance of UHV AC Transmission Lines

20.99 WD approved for registration as CD

TC 122 më tepër

Information technology - Brain-computer Interfaces - Overview of ethical and societal concerns

00.00 Proposal for new project received

ISO/IEC JTC 1/SC 43 më tepër

Power cables with Aluminum Conductor for rated voltages 1 kV and 3 kV

00.99 Approval to ballot proposal for new project

TC 18/SC 18A më tepër

Proprioceptive Interaction

00.99 Approval to ballot proposal for new project

TC 100/TA 18 më tepër

Interoperability specifications and communication method for external power supplies used with computing and consumer electronics devices

60.00 Standard under publication

TC 100/TA 18 më tepër

High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part 1: Common equipment and equipment specific to Line-Commutated Converters

20.99 WD approved for registration as CD

TC 115 më tepër

High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part2: Using voltage sourced converters

20.99 WD approved for registration as CD

TC 115 më tepër

Piezoelectric sensors - Part 1: Generic specifications

40.20 DIS ballot initiated: 12 weeks

TC 49 më tepër

Piezoelectric sensors - Part 2: Chemical and biochemical sensors

40.20 DIS ballot initiated: 12 weeks

TC 49 më tepër

Piezoelectric sensors - Part 3: Physical sensors

40.20 DIS ballot initiated: 12 weeks

TC 49 më tepër

UHV AC transmission systems - Security and stability requirements for system planning and design

50.00 Final text received or FDIS registered for formal approval

TC 122 më tepër

UHV AC transmission systems - Part 201: UHV AC substation design

20.99 WD approved for registration as CD

TC 122 më tepër

UHV AC transmission systems - Part 301: On-site acceptance tests

50.00 Final text received or FDIS registered for formal approval

TC 122 më tepër

UHV AC transmission systems - Part 401: Substation maintenance

50.00 Final text received or FDIS registered for formal approval

TC 122 më tepër

Mobile Remotely Controlled Systems (MRCS) for nuclear and radiological applications - Particular requirements for ground surveillance

40.20 DIS ballot initiated: 12 weeks

TC 45 më tepër

Mobile remotely controlled systems for nuclear and radiological applications - Particular requirements for aerial surveillance

30.20 CD study/ballot initiated

TC 45 më tepër

MRCS for nuclear and radiological applications - Performance and test requirements for underwater vehicles

30.20 CD study/ballot initiated

TC 45 më tepër