DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Circuit-breaker in modular form

40.99 Full report circulated: DIS approved for registration as FDIS

TC 3/SC 3D më tepër

IEC 63243 Cable tray systems and cable ladder systems

40.60 Close of voting

TC 3/SC 3D më tepër

Maintenance of UoM data dictionary (IEC 62720)

50.60 Close of voting. Proof returned by secretariat

TC 3/SC 3D më tepër

Environmental condition code improvements according IEC 60721-3-1:2018 

40.60 Close of voting

TC 3/SC 3D më tepër

Certificate and approval

30.20 CD study/ballot initiated

TC 3/SC 3D më tepër

Cleanroom classification

20.99 WD approved for registration as CD

TC 3/SC 3D më tepër

Standard data element types with associated classification scheme - Part 1: Definitions - Principles and methods

20.99 WD approved for registration as CD

TC 3/SC 3D më tepër

Standard data element types with associated classification scheme for electric components - Part 6: CDD modelling guideline for the use of concepts

20.99 WD approved for registration as CD

TC 3/SC 3D më tepër

Electrical installations of ships and mobile and fixed offshore units - Part 1: Procedures for calculating short-circuit currents in three-phase a.c.

30.60 Close of voting/ comment period

TC 18 më tepër

Railway applications - Rolling stock equipment - Shock and vibration tests

60.00 Standard under publication

TC 9 më tepër

Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile

40.20 DIS ballot initiated: 12 weeks

TC 9 më tepër

Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone

40.20 DIS ballot initiated: 12 weeks

TC 9 më tepër

Electronic railway equipment - Train communication network (TCN) - Part 2-6: Train-to-ground communication

50.60 Close of voting. Proof returned by secretariat

TC 9 më tepër

Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB)

20.99 WD approved for registration as CD

TC 9 më tepër

Electronic railway equipment - Train communication network (TCN) - Part 3-4: Ethernet Consist Network (ECN)

20.99 WD approved for registration as CD

TC 9 më tepër

Interpretation Sheet 1 - Wind energy generation systems - Part 1: Design requirements

00.99 Approval to ballot proposal for new project

TC 88 më tepër

Design requirements for Wind Turbine Generators

20.99 WD approved for registration as CD

TC 2 më tepër

Wind energy generation systems - Part 12: Power performance measurements of electricity producing wind turbines - Overview

30.20 CD study/ballot initiated

TC 88 më tepër