Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Guidelines for inertia management of renewable penetrated power system - Part 1:Framework design
20.99 WD approved for registration as CD
Carbon Footprint Product Category Rules for Photovoltaic Products - Part 1: Photovoltaic(PV) Modules
20.99 WD approved for registration as CD
Autonomous WPT on moving devices which support multimedia and service
30.20 CD study/ballot initiated
Statistical method for verification of measurement performance
20.99 WD approved for registration as CD
Guidance on Multi-Functional Integrated Services “Street” Poles to support Smart Cities
40.99 Full report circulated: DIS approved for registration as FDIS
Guidelines for evaluating DV/DT robustness of SIC power devices (Fast Track)
40.00 DIS registered
Guidelines for Gate Charge (Q<sub>G</sub>) test method for SIC MOSFET (Fast Track)
40.00 DIS registered
Nuclear facilities - Lightning protection and management
20.99 WD approved for registration as CD
Generic EMT Simulation Models of Converter-based Power Plants for Power System Dynamic Analysis
20.99 WD approved for registration as CD
Electrical installation guide - Part 204: Application guides complying with IEC 60364 - Rotating generators
00.99 Approval to ballot proposal for new project
Application function blocks and logic diagrams for Upstream Oil & Gas processes – System Control Diagrams – Part 3: Application Function Blocks
10.60 Close of voting
Application function blocks and logic diagrams for Upstream Oil & Gas processes – System Control Diagrams – Part 2: Diagram symbols and drawing principles
10.60 Close of voting
Sampling and Conditioning LNG for Continuous Analysis
00.99 Approval to ballot proposal for new project
Industrial measurement control and automation - Requirements for the servitization of manufacturing resource and manufacturing capability
10.60 Close of voting
Process Automation Device Information Model (PA-DIM) for integration in enterprise systems
00.99 Approval to ballot proposal for new project