DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Nuclear power plants - Human-machine interfaces - Alarm functions and presentation

30.60 Close of voting/ comment period

TC 45/SC 45A më tepër

Photovoltaic pumping systems - Design qualification and performance measurements

20.99 WD approved for registration as CD

TC 82 më tepër

Photovoltaic pumping systems - Part 1: Performance, safety, and durability assessment for small-scale off-grid solar water pumps

20.99 WD approved for registration as CD

TC 82 më tepër

Renewable energy and hybrid systems for rural electrification - Part 10: Silicon solar module visual inspection guide

20.99 WD approved for registration as CD

TC 82 më tepër

Recommendations for renewable energy and hybrid systems for rural electrification - Part 12-1: Laboratory evaluation of lamps and lighting appliances for off-grid electricity systems

20.99 WD approved for registration as CD

TC 82 më tepër

Renewable energy and hybrid systems for rural electrification - Part 120: Procurement processes, including tendering and evaluation

20.99 WD approved for registration as CD

TC 82 më tepër

Renewable energy and hybrid systems for rural electrification - Part 200: System selection and design

50.00 Final text received or FDIS registered for formal approval

TC 82 më tepër

Renewable energy off-grid systems - Part 301: Generators - Integration of solar with other forms of power generation within hybrid power systems

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 82 më tepër

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7-2: Generator set - Off-grid wind turbines

20.99 WD approved for registration as CD

TC 82 më tepër

Renewable energy off-grid systems - Part 341: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 më tepër

Renewable energy off-grid systems - Part 350: Recommendations for selection of inverters

50.00 Final text received or FDIS registered for formal approval

TC 82 më tepër

Secondary cells and batteries containing alkaline or other non-acid electrolytes - Nickel-cadmium prismatic rechargeable cells with partial gas recombination and batteries for use in industrial applications.

30.99 CD approved for registration as DIS

TC 21/SC 21A më tepër

Enterprise-control system integration - Part 2: Object and attributes for enterprise-control system integration

40.60 Close of voting

TC 65/SC 65E më tepër

Enterprise-control system integration — Part 2: Objects and attributes for enterprise-control system integration

40.20 DIS ballot initiated: 12 weeks

ISO/TC 184/SC 5 më tepër

Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration

40.20 DIS ballot initiated: 12 weeks

TC 65/SC 65E më tepër

Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration

30.99 CD approved for registration as DIS

ISO/TC 184/SC 5 më tepër

Enterprise-control system integration - Part 5: Business to manufacturing transactions

30.99 CD approved for registration as DIS

TC 65/SC 65E më tepër

Enterprise-control system integration — Part 5: Business to manufacturing transactions

30.00 Committee draft (CD) registered

ISO/TC 184/SC 5 më tepër