Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Obsolescence Management Part 2: Forecasting obsolescence cost
30.60 Close of voting/ comment period
Obsolescence Management Part 3: Exchange of information regarding change and discontinuance of products
30.60 Close of voting/ comment period
Type F and type B residual current operated circuit-breakers with and without integral overcurrent protection for household and similar uses
30.99 CD approved for registration as DIS
Type F and type B residual current operated circuit-breakers with and without integral overcurrent protection for household and similar uses
20.99 WD approved for registration as CD
Railway applications - Communication, signalling and processing systems - Safety related electronic systems for signalling
60.00 Standard under publication
EMC IC modelling - Part 4: Models of integrated circuits for RF immunity behavioural simulation - Conducted immunity modelling (ICIM-CI) - Section 1: Technical Report on the use of ICIM-CI model (IEC 62433-4) to predict the IC conducted immunity in a PCB
40.99 Full report circulated: DIS approved for registration as FDIS
Security for Industrial Automation and Control Systems - Part 1-6: Application of the IEC 62443 standards to the Industrial Internet of Things
30.60 Close of voting/ comment period
Security for industrial automation and control systems – Part 2-2: IACS Security Protection
50.60 Close of voting. Proof returned by secretariat
Security for industrial automation and control systems – Part 6-2: Security evaluation methodology for IEC 62443-4-2
60.00 Standard under publication
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 3: Photovoltaic modules and plants - Outdoor infrared thermography
20.99 WD approved for registration as CD
Photovoltaic (PV) system - Requirements for testing, documentation and maintenance - Part 4: Photovoltaic modules and plants - Outdoor electroluminescence imaging
50.00 Final text received or FDIS registered for formal approval
Field device tool (FDT) interface specification - Part 1: Overview and guidance
40.99 Full report circulated: DIS approved for registration as FDIS
Field Device Tool (FDT) Interface Specification - Part 53-31: Communication implementation for CLI and HTML – IEC 61784 CP 3/1 and CP 3/2
50.60 Close of voting. Proof returned by secretariat
Field Device Tool (FDT) Interface Specification - Part 53-90: Communication implementation for CLI and HTML – IEC 61784 CPF 9
50.60 Close of voting. Proof returned by secretariat
Radiation protection instrumentation - Determination of uncertainty in measurement
50.00 Final text received or FDIS registered for formal approval
IEC SDB 62474: MC-2024-EL-1 updates for EU RoHS Annex III Exemption List and Annex IV Exemptions List
30.60 Close of voting/ comment period
Add six new entries based on the ECHA consultation list for REACH SVHC Candidate List that was posted on August 30, 2024.
40.99 Full report circulated: DIS approved for registration as FDIS
High-current test techniques - Definitions and requirements for test currents and measuring systems
30.60 Close of voting/ comment period