Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 2: Pot-cores for use in telecommunications, power supply, and filter applications
40.99 Full report circulated: DIS approved for registration as FDIS
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 4: RM-cores
40.99 Full report circulated: DIS approved for registration as FDIS
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 5: EP-cores and associated parts for use in inductors and transformers
40.99 Full report circulated: DIS approved for registration as FDIS
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 9: Planar cores
40.99 Full report circulated: DIS approved for registration as FDIS
Grid code compliance assessment methods for grid connection of wind and PV power plants
30.20 CD study/ballot initiated
Electrical installations in ships – Primary DC distribution, system design architecture
20.99 WD approved for registration as CD
Hydraulic turbines, storage pumps and pump-turbines – Hydraulic transient analysis, design considerations and testing
60.00 Standard under publication
Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality
20.99 WD approved for registration as CD
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 1: Performance
30.60 Close of voting/ comment period
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 2: Safety
30.60 Close of voting/ comment period
Information exchange for electric vehicle charging roaming service Part 3: Message structure
30.60 Close of voting/ comment period
Guidelines for qualifying PV modules, components and materials for operation at high temperatures
60.00 Standard under publication
Amendment 1 - Determination of inrush current characteristics of lighting products
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Application function blocks and logic diagrams for Upstream Oil & Gas processes – System Control Diagrams – Part 1: General principles
30.60 Close of voting/ comment period
Guidance for installation procedures and tolerances of hydroelectric machines – Part 7: Horizontal Generator
50.00 Final text received or FDIS registered for formal approval
Guidance for installation procedures and tolerances of hydroelectric machines – Part 8: Horizontal Francis Turbine
50.00 Final text received or FDIS registered for formal approval
Multi-channel radio frequency connectors - Part 4: Sectional specification for type L32-4 and L32-5 circular connectors
40.60 Close of voting