DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7-2: Generator set - Off-grid wind turbines

20.99 WD approved for registration as CD

TC 82 more

Renewable energy off-grid systems - Part 341: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Renewable energy off-grid systems - Part 350: Recommendations for selection of inverters

50.00 Final text received or FDIS registered for formal approval

TC 82 more

Secondary cells and batteries containing alkaline or other non-acid electrolytes - Nickel-cadmium prismatic rechargeable cells with partial gas recombination and batteries for use in industrial applications.

30.99 CD approved for registration as DIS

TC 21/SC 21A more

Enterprise-control system integration - Part 2: Object and attributes for enterprise-control system integration

40.60 Close of voting

TC 65/SC 65E more

Enterprise-control system integration — Part 2: Objects and attributes for enterprise-control system integration

40.20 DIS ballot initiated: 12 weeks

ISO/TC 184/SC 5 more

Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration

40.20 DIS ballot initiated: 12 weeks

TC 65/SC 65E more

Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration

30.99 CD approved for registration as DIS

ISO/TC 184/SC 5 more

Enterprise-control system integration - Part 5: Business to manufacturing transactions

30.99 CD approved for registration as DIS

TC 65/SC 65E more

Enterprise-control system integration — Part 5: Business to manufacturing transactions

30.00 Committee draft (CD) registered

ISO/TC 184/SC 5 more

Enterprise-control system integration — Part 7: Alias Service Model

10.92 Proposal returned to submitter for further definition

ISO/TC 184/SC 5 more

Enterprise-control system integration — Part 7: Part 7 Alias Service Model

10.92 Proposal returned to submitter for further definition

ISO/TC 184/SC 5 more

High-voltage switchgear and controlgear - Part 111: Automatic circuit reclosers for alternating current systems above 1 000 V

30.60 Close of voting/ comment period

TC 17/SC 17A more

High-voltage switchgear and controlgear - Part 201: AC solid-insulation enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV

50.00 Final text received or FDIS registered for formal approval

TC 17/SC 17C more

High-voltage switchgear and controlgear - Part 205: Compact switchgear assemblies, mobile and prefabricated substations for rated voltage above 52 kV

30.60 Close of voting/ comment period

TC 17/SC 17C more

High-voltage switchgear and controlgear - Part 208: Methods to quantify the steady state, power-frequency electromagnetic fields generated by HV switchgear assemblies and HV/LV prefabricated substations, both for rated voltages above 1 kV and up to and including 52 kV

50.00 Final text received or FDIS registered for formal approval

TC 17/SC 17C more

Amendment 1 - High-voltage switchgear and controlgear - Part 213: Voltage detecting and indicating system

30.99 CD approved for registration as DIS

TC 17/SC 17C more

High-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV

20.99 WD approved for registration as CD

TC 17/SC 17C more