DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Instrument transformers - Part 14: Additional requirements for current transformers for DC applications

40.00 DIS registered

TC 38 more

Instrument transformers - Part 15: Additional requirements for voltage transformers for DC applications

40.00 DIS registered

TC 38 more

Instrument transformers - Part 2: Additional requirements for current transformers

20.99 WD approved for registration as CD

TC 38 more

IEC 61869-201: Instrument transformers - Part 201: General requirements for Instrument Transformers for low voltage applications (≤1000 V AC and 1500 V DC)

20.99 WD approved for registration as CD

TC 38 more

Instrument transformers - Part 22: Instrument transformers integrated with other devices with <em>U</em><sub>m</sub> ≤ 36 kV - Requirements and tests

30.99 CD approved for registration as DIS

TC 38 more

Instrument transformers - Part 3: Additional requirements for inductive voltage transformers

20.99 WD approved for registration as CD

TC 38 more

Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers

20.99 WD approved for registration as CD

TC 38 more

Instrument transformers - Part XX: Current sensors

20.99 WD approved for registration as CD

TC 38 more

Nuclear power plants - Instrumentation important to safety - Determination and maintenance of trip setpoints

40.60 Close of voting

TC 45/SC 45A more

Mobile and fixed offshore units - Electrical installations - Part 1: General requirements and conditions

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 2: System design

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 3: Equipment

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 4: Cables

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 5: Mobile units

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 6: Installation

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 7: Hazardous areas

30.99 CD approved for registration as DIS

TC 18 more

Tests recommended on cables with a longitudinally applied metal foil for rated voltages above 30 kV (U<sub>m</sub> = 36 kV) up to and including 500 kV (U<sub>m</sub> = 550 kV)

30.60 Close of voting/ comment period

TC 20 more

Industrial networks - Installation of communication networks in industrial premises

30.20 CD study/ballot initiated

TC 65/SC 65C more