Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Improvement of Name Plate structures in IEC 61360-7
40.99 Full report circulated: DIS approved for registration as FDIS
Standard data element types with associated classification scheme - Part 1: Definitions - Principles and methods
30.60 Close of voting/ comment period
Standard data element types with associated classification scheme for electric components - Part 6: CDD modelling guideline for the use of concepts
20.99 WD approved for registration as CD
Electrical installations of ships and mobile and fixed offshore units - Part 1: Procedures for calculating short-circuit currents in three-phase a.c.
30.60 Close of voting/ comment period
Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile
40.20 DIS ballot initiated: 12 weeks
Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone
40.60 Close of voting
Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB)
20.99 WD approved for registration as CD
Electronic railway equipment - Train communication network (TCN) - Part 3-4: Ethernet Consist Network (ECN)
20.99 WD approved for registration as CD
Interpretation Sheet 1 - Wind energy generation systems - Part 1: Design requirements
00.99 Approval to ballot proposal for new project
Design requirements for Wind Turbine Generators
20.99 WD approved for registration as CD
Wind turbines - Part 11: Acoustic noise measurement techniques
20.99 WD approved for registration as CD
Wind energy generation systems - Part 12: Power performance measurements of electricity producing wind turbines - Overview
30.60 Close of voting/ comment period
Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
30.60 Close of voting/ comment period
Wind energy generation systems - Part 12-2: Power performance of electricity producing wind turbines based on nacelle anemometry
30.60 Close of voting/ comment period
Wind energy generation systems - Part 12-3: Power performance - Measurement based site calibration
30.60 Close of voting/ comment period
Wind energy generation systems - Part 12-5: Power performance - Assessment of obstacles and terrain
30.99 CD approved for registration as DIS
Wind energy generation systems - Part 12-5: Power performance - Assessment of obstacles and terrain
30.60 Close of voting/ comment period
Wind energy generation systems - Part 12-6: Measurement based nacelle transfer function of electricity producing wind turbines
30.60 Close of voting/ comment period