Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Amendment 1 - High-voltage switchgear and controlgear - Part 215: Phase comparator used with VDIS
30.99 CD approved for registration as DIS
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
30.99 CD approved for registration as DIS
High voltage switchgear and controlgear data and properties for information exchange - Part 321: Catalogue data
50.00 Final text received or FDIS registered for formal approval
High-voltage switchgear and controlgear - Part 322: The use of digital technologies
50.00 Final text received or FDIS registered for formal approval
Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS) – Part 1: Generic RAMS process
50.60 Close of voting. Proof returned by secretariat
Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS) – Part 2: Systems approach to safety
50.60 Close of voting. Proof returned by secretariat
Fuel cell technologies – Part 2-201: Fuel cell modules - Performance test methods for PEM module
20.99 WD approved for registration as CD
Fuel cell technologies - Part 2-400: Fuel cell modules - Calculation of Rated Power and Power Density of a PEM stack and PEM module
30.60 Close of voting/ comment period
Fuel cell technologies - Part 3-100: Stationary fuel cell power systems - Safety
30.60 Close of voting/ comment period
Fuel cell technologies - Part 3-200: Stationary fuel cell power systems - Performance test methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fuel cell technologies - Part 3-201: Stationary fuel cell power systems - Performance test methods for small fuel cell power systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fuel cell technologies - Part 4-401: Fuel cell power systems for propulsion and auxiliary power units - Maritime sector - Safety of PEMFC-Systems
20.99 WD approved for registration as CD
Fuel cell technologies - Part 7-1: Test methods - Single cell performance tests for polymer electrolyte fuel cells (PEFC)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fuel cell technologies - Part 8-101: Energy storage systems using fuel cell modules in reverse mode - Test procedures for the performance of solid oxide single cells and stacks, including reversible operation
20.99 WD approved for registration as CD
Fuel cell technologies - Part 8-102: Energy storage systems using fuel cell modules in reverse mode - Test procedures for the performance of single cells and stacks with proton exchange membrane, including reversible operation
20.99 WD approved for registration as CD
Effective area measurements of single-mode optical fibres - Guidance
50.00 Final text received or FDIS registered for formal approval
Measurement of standby power for appliances and equipment
40.20 DIS ballot initiated: 12 weeks
Health software – Software life cycle processes
20.99 WD approved for registration as CD