DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Amendment 1 - High-voltage switchgear and controlgear - Part 215: Phase comparator used with VDIS

30.99 CD approved for registration as DIS

TC 17/SC 17C more

High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850

30.99 CD approved for registration as DIS

TC 17 more

High voltage switchgear and controlgear data and properties for information exchange - Part 321: Catalogue data

50.00 Final text received or FDIS registered for formal approval

TC 17 more

High-voltage switchgear and controlgear - Part 322: The use of digital technologies

50.00 Final text received or FDIS registered for formal approval

TC 17 more

Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS) – Part 1: Generic RAMS process

50.60 Close of voting. Proof returned by secretariat

TC 9 more

Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS) – Part 2: Systems approach to safety

50.60 Close of voting. Proof returned by secretariat

TC 9 more

Fuel cell technologies – Part 2-201: Fuel cell modules - Performance test methods for PEM module

20.99 WD approved for registration as CD

TC 105 more

Fuel cell technologies - Part 2-400: Fuel cell modules - Calculation of Rated Power and Power Density of a PEM stack and PEM module

30.60 Close of voting/ comment period

TC 105 more

Fuel cell technologies - Part 3-100: Stationary fuel cell power systems - Safety

30.60 Close of voting/ comment period

TC 105 more

Fuel cell technologies - Part 3-200: Stationary fuel cell power systems - Performance test methods

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 105 more

Fuel cell technologies - Part 3-201: Stationary fuel cell power systems - Performance test methods for small fuel cell power systems

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 105 more

Fuel cell technologies - Part 4-401: Fuel cell power systems for propulsion and auxiliary power units - Maritime sector - Safety of PEMFC-Systems

20.99 WD approved for registration as CD

TC 105 more

Fuel cell technologies - Part 7-1: Test methods - Single cell performance tests for polymer electrolyte fuel cells (PEFC)

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 105 more

Fuel cell technologies - Part 8-101: Energy storage systems using fuel cell modules in reverse mode - Test procedures for the performance of solid oxide single cells and stacks, including reversible operation

20.99 WD approved for registration as CD

TC 105 more

Fuel cell technologies - Part 8-102: Energy storage systems using fuel cell modules in reverse mode - Test procedures for the performance of single cells and stacks with proton exchange membrane, including reversible operation

20.99 WD approved for registration as CD

TC 105 more

Effective area measurements of single-mode optical fibres - Guidance

50.00 Final text received or FDIS registered for formal approval

TC 86/SC 86A more

Measurement of standby power for appliances and equipment

40.20 DIS ballot initiated: 12 weeks

TC 59 more

Health software – Software life cycle processes

20.99 WD approved for registration as CD

TC 62/SC 62A more