DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 63138-4 ED1

Multi-channel radio-frequency connectors - Part 4: Sectional specification for type L32-4 and L32-5 circular connectors

General information

50.20     Oct 24, 2025

PRVD    Dec 5, 2025

IEC

TC 46/SC 46F

International Standard

33.120.30  

Scope

IEC 63138-4:2025, which is a Sectional Specification (SS), provides information and rules for the preparation of Detail Specifications (DS) for type L32-4 and L32-5 circular connectors with four RF channels and five RF channels, as well as a detailed specification of the blank format.
The L32-4 and L32-5 circular connectors with 50 Ω nominal impedance has four RF channels and five RF channels which can be engaged and disengaged at the same time. They are characterized by threaded coupling mechanisms, anti-misinsertion mechanism, and the operating frequency of each channel is up to 4 GHz. These connectors have been widely used in mobile communication system like TD-SCDMA and TD-LTE and can also be used in some similar equipment.
This document also specifies mating face dimensions for general connectors (grade 2), gauging information and tests selected from IEC 63138-1, applicable to all Detail Specifications relating to type L32 4 and L32-5 circular connectors.
This document cancels and replaces IEC 61169-59:2017.
This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to IEC 61169 59:2017:
a) use of IEC 63138-1:2019 as its generic specification instead of using IEC 61169-1:2013;
b) all the subclauses and test methods are in line with IEC 63138-1:2019;
c) dimension "g" in Table 3, Table 4, Table 7 and Table 8 has been changed from "0,00 min. to 0,8 max." to "1,6 min. to 2,1 max.".

Life cycle

PREVIOUSLY

PUBLISHED
IEC 61169-59:2017 ED1

NOW

IN_DEVELOPMENT
IEC 63138-4 ED1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Oct 24, 2025

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login