Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced Macro bend multimode fibre – Part 3-XX: Connector parameters of physically contacting 50 μm core diameter fibres – Non-angled polyphenylene sulphide rectangular ferrules with a single row of 16 fibres for reference connector applications
20.99 WD approved for registration as CD
Industrial automation equipment and systems – Part 2: Algorithm Verification Methods
30.20 CD study/ballot initiated
Asset Administration Shell for Industrial Applications – Part 2: Information meta model
30.60 Close of voting/ comment period
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
30.60 Close of voting/ comment period
Asset administration shell for industrial applications - Part 4:Applications of Asset Administration Shell
40.60 Close of voting
Asset Administration Shell for industrial applications – Part 5: Interfaces
30.60 Close of voting/ comment period
E-Transporters – Part 2-2: Safety requirements and test methods for autonomous cargo e-Transporters
40.99 Full report circulated: DIS approved for registration as FDIS
LVDC systems - Part 101: DC power distribution system for typical scenarios
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
LVDC systems - Low-voltage DC electric island power supply systems
60.00 Standard under publication
IEC TR 63282-103: LVDC systems - Part 103: Flexible interconnection systems with LVDC
30.20 CD study/ballot initiated
IEC TR 63282-104-1: LVDC systems - Part 104-1: Power Quality - Voltage characteristics in public LVDC power supply systems
30.20 CD study/ballot initiated
IEC TR 63282-104-2: LVDC systems - Part 104-2: Power Quality - Voltage characteristics in industrial locations for low-frequency conducted disturbances
30.20 CD study/ballot initiated
Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Industrial-process measurement, control and automation – Smart Manufacturing – Part 4: Usage of new technologies and standardization
50.00 Final text received or FDIS registered for formal approval
Power Electronic Converters for Distributed Energy Resources - Part 3: Performance and test methods
20.99 WD approved for registration as CD
Semiconductor devices - Generic semiconductor qualification guidelines - Part 3: Guidelines for reliability qualification plans for power semiconductor module
40.99 Full report circulated: DIS approved for registration as FDIS
Semiconductor devices - Guidelines for reliability qualification plans - Part 4: Early failure assessment
40.60 Close of voting
High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 1: Guideline
20.99 WD approved for registration as CD